引用本文:孙 强,颜永强,朱岸明,吴经锋.750 kV在建工程电气主设备制造问题分析[J].电网与清洁能源,2008,24(4):15~17 |
摘要点击次数: 834 |
全文下载次数: 396 |
|
|
中文摘要:列举了西北750 kV在建工程750 kV电气主设备在研制中发现的主要问题,分析了问题存在的原因,并对电网运行单位在今后750 kV电气主设备制造中需注意的问题提出了解决的建议。 |
中文关键词:750 kV 电气主设备 制造 技术分析 |
|
Analysis of Electrical Main Equipments Manufacturing for 750 kV Project under Construction |
|
|
Abstract:In this paper the main problems related to the manufacturing of 750 kV electrical main equipments, which will be employed in 750 kV project under construction in Northwest China, is listed. The causes were analyzed, and then measurements for improvement were suggested for further manufacturing. |
keywords:750 kV electrical main equipments manufacture technical analysis |