主动配电网中消纳高渗透率风电的风电源规划
作者:
作者单位:

1. 武汉大学电气工程学院, 湖北省武汉市 430072; 2. 国网山西省电力公司朔州供电公司, 山西省朔州市 036000

摘要:

考虑主动管理和需求侧管理措施,针对分布式风电源(WTG)出力模糊随机的运行特性,建立了主动配电网中分布式电源双层模糊随机机会约束规划模型。首先将风速处理为一个随机模糊变量,以处理实际风速因历史统计数据不足产生的误差。在此基础上,考虑主动管理和需求侧管理措施,构建双层模糊随机机会约束规划模型,上层以模糊随机年利润最大为目标,下层以WTG有功削减费用和负荷中断费用之和最小为目标,各项静态安全指标均以模糊随机机会约束考虑,采用遗传算法、蒙特卡洛模拟和原对偶内点法对上下层模型进行求解。最后通过IEEE 14节点配电系统进行了仿真计算,验证了所提模糊随机机会约束规划模型的有效性和合理性。

关键词:

基金项目:

通信作者:

作者简介:


Planning of Wind Turbine Generators for High-penetration Wind Power Accommodation in Active Distribution Network
Author:
Affiliation:

1. School of Electrical Engineering, Wuhan University, Wuhan 430072, China; 2. Shuozhou Power Supply Company of State Grid Shanxi Electric Power Company, Shuozhou 036000, China

Abstract:

Taking active management(AM)measures and demand side management(DSM)measures, as well as operating characteristics of wind turbine generators(WTGs)in the planning stage, a bi-layer fuzzy random chance constrained model on distributed generation planning for active distribution network is built. Firstly, the wind speed is treated as a random fuzzy variable in order to deal with error of actual wind speed due to lack of historical data. On this base, a bi-layer fuzzy random chance constrained planning model is constructed by considering AM measures and DSM measures. The maximum annual fuzzy random profit is regarded as the objective function for the upper-layer of the built planning model and the minimum total cost of active power reduction of distributed generator and load interruption is taken as the objective function of lower-layer of the built planning model. All static safety indicators are considered in the form of fuzzy random chance constraints. The upper-layer and lower-layer of the planning model are solved by genetic algorithm, Monte Carlo simulation(MCS)and prime-dual interior point method. Finally, the validity and rationality of the bi-layer planning model are verified by simulation example of IEEE 14-bus system.

Keywords:

Foundation:
引用本文
[1]高鹏,陈红坤,张光亚,等.主动配电网中消纳高渗透率风电的风电源规划[J].电力系统自动化,2018,42(15):39-46. DOI:10.7500/AEPS20180131006.
GAO Peng, CHEN Hongkun, ZHANG Guangya, et al. Planning of Wind Turbine Generators for High-penetration Wind Power Accommodation in Active Distribution Network[J]. Automation of Electric Power Systems, 2018, 42(15):39-46. DOI:10.7500/AEPS20180131006.