首页 | 官方网站   微博 | 高级检索  
     

基于组合赋权-改进可拓云模型的城市水生态PPP 项目绩效综合评价
引用本文:卜 波,綦春明,罗 聪.基于组合赋权-改进可拓云模型的城市水生态PPP 项目绩效综合评价[J].工程管理学报,2022,36(1):94-099.
作者姓名:卜 波  綦春明  罗 聪
作者单位:1,2,3. 南华大学 土木工程学院;1,3. 衡阳市水务投资集团有限公司
摘    要:随着 PPP 模式在城市水生态治理领域的广泛运用,准确地评估城市水生态 PPP 项目实施绩效的需求日益凸显。通过对传统可拓云模型的改进,提出了一种组合赋权-改进可拓云绩效综合评价模型,以结果导向为切入点构建了绩效指标体系,从产出、效果、管理层面对城市水生态 PPP 项目建设运营阶段的绩效进行综合评价,并应用该模型对某污水处理 PPP项目进行绩效评价,结果表明:该项目建设阶段和运营阶段的绩效等级分别为 1.3680 和 1.6254,模型评价结果与项目实际相符,结果精度相比其他物元可拓模型的评估结果更高,验证了该模型的准确性。还结合该项目实际,提出了城市水生态PPP 项目绩效管理的发展意见。

关 键 词:城市水生态  PPP  项目  改进可拓云  绩效综合评价

Comprehensive Performance Evaluation of Urban Water Ecology PPP ProjectBased on Combination Weighting Approach and Improved Extension Cloud Model
BU Bo,,QI Chun-ming,LUO Cong,.Comprehensive Performance Evaluation of Urban Water Ecology PPP ProjectBased on Combination Weighting Approach and Improved Extension Cloud Model[J].Journal of Engineering Management,2022,36(1):94-099.
Authors:BU Bo    QI Chun-ming  LUO Cong  
Affiliation:1,2,3. School of Civil Engineering, University of South China;1,3. Hengyang Water Investment Group Co. Ltd.
Abstract:With the widespread use of the PPP model in the field of urban water ecology governance, the need to accuratelyevaluate the implementation performance of urban water ecology PPP projects has become increasingly prominent. Based on theimprovement of the traditional extension cloud model, a comprehensive performance evaluation model integrating combinedweighting approach with improved extension cloud method is proposed. The evaluation model constructs a performance indexsystem with results-oriented entry point to comprehensively evaluate the performance of urban water ecology PPP projects from theaspects of output, effect, and management levels. The model is applied to the performance evaluation of a wastewater treatment PPPproject. The results show that the performance levels for the construction and operation of the project is 1.3680 and 1.6254,respectively. The evaluation results of the model are consistent with the actual project; the accuracy of the results is higher than thatof other matter-element extension models. This verifies the accuracy of the model. The development suggestions of urban waterecology PPP project performance management are proposed in the light of the actual project.
Keywords:urban water ecology  PPP project  improved extension cloud  comprehensive performance evaluation
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号