首页 | 官方网站   微博 | 高级检索  
     

河流下浅埋深薄基岩煤层部分开采可行性分析
引用本文:范淑敏,' target='_blank'>,张玉军,' target='_blank'>.河流下浅埋深薄基岩煤层部分开采可行性分析[J].中州煤炭,2020,0(8):187-191.
作者姓名:范淑敏  ' target='_blank'>  张玉军  ' target='_blank'>
作者单位:(1.中煤科工开采研究院有限公司,北京 100013; 2.天地科技股份有限公司 开采设计事业部,北京 100013)
摘    要:控制覆岩破坏高度是实现水体下安全开采的关键。针对“浅埋深、薄基岩、坚硬顶板”河流下压覆煤炭资源的问题,采用数值模拟的方法,计算了巷柱式和房柱式等部分开采的覆岩破坏高度,并从防水煤岩柱留设、岩梁极限跨度以及煤柱稳定性3个方面论述河流下部分开采的可行性。研究结果表明,部分开采能够很好地控制覆岩破坏高度,煤岩柱厚度基本满足留设防水安全煤岩柱要求;由于上覆基岩柱中存在厚度大于10 m的粗砂岩,在跨度小于8.53 m的情况下可以支撑上覆岩层;设计煤柱安全系数为1.28~1.81,均满足要求。采用采6 m、留6 m的巷柱(窄条带)式开采是最佳方案,面积采出率为50%,按总采出率45%计算,可解放河流压覆区域约52万t煤炭。

关 键 词:河流下  浅埋深  薄基岩  部分开采  采留宽度

 Feasibility analysis on partial mining of shallow deep thin bed coal seam under river
Fan Shumin,' target='_blank'>,Zhang Yujun,' target='_blank'>. Feasibility analysis on partial mining of shallow deep thin bed coal seam under river[J].Zhongzhou Coal,2020,0(8):187-191.
Authors:Fan Shumin  ' target='_blank'>  Zhang Yujun  ' target='_blank'>
Affiliation:(1.CCTEG Coal Mining Research Institute,Beijing 100013,China;2.Coal Mining and Designing Department,Tiandi Science and Technology Co.,Ltd.,Beijing 100013,China)
Abstract:Controlling the failure height of overburden is the key to realize safe mining under water.Aiming at the problem of "shallow buried depth,thin bedrock,hard roof ",the overburden failure height of roadway pillar and house pillar mining was calculated by numerical simulation,and the feasibility of partial mining under the river is discussed from three aspects:the retaining of waterproof coal and rock pillar,the limit span of rock beam and the stability of coal pillar.The results show that:partial mining can control the failure height of overburden well,the thickness of coal pillar basically meets the requirement of retaining waterproof and safe coal pillar;and because there are coarse sandstone with thickness more than 10 m in overlying bedrock pillar,the overlying strata can be supported with span less than 8.53 m;the designed safety factor of coal pillar is 1.28~1.81,all meet the requirement.Using 6 m mining,and 6 m of roadway pillar(narrow strip) mining is the best scheme.Area recovery rate is 50%,according to the total recovery rate of 45%,about 520 thousand t of coal can be extracted in the river overburden area.
Keywords:,under river, shallow buried depth, thin bedrock, partial mining, rational mining and reservation width
本文献已被 CNKI 等数据库收录!
点击此处可从《中州煤炭》浏览原始摘要信息
点击此处可从《中州煤炭》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号