首页 | 官方网站   微博 | 高级检索  
     

金华江下游灵马枢纽建设与航道深开挖方案比选分析
引用本文:王峰,张铭,尤克诗,方向征.金华江下游灵马枢纽建设与航道深开挖方案比选分析[J].水利水运工程学报,2019,0(5):108-113.
作者姓名:王峰  张铭  尤克诗  方向征
作者单位:1.金华市港航管理局,浙江 金华 321000
基金项目:国家重点研发计划资助项目(2017YFC0405604);中央级公益性科研院所基本科研业务费专项资金资助项目(Y115005)
摘    要:内河航运工程常采用梯级枢纽建设或航道整治两种开发模式,在实际应用中需通过综合对比论证以优化开发方案。利用水动力数值计算方法,对金华江航运开发工程中灵马枢纽建设与航道深开挖两种方案效果进行对比分析,论证并优选工程建设方案。结果表明:若通过航道深开挖,研究河段最大疏浚深度超过5 m,水流归槽引起河道裸滩将破坏环境与生态;而灵马梯级枢纽建设方案不仅可使航道通航保证率提高至95%以上,还可显著改善该区域水生态环境与人文景观,是实现金华江Ⅳ级航道建设目标的必要条件。

关 键 词:山区航道    航道疏浚    水动力计算    水文分析    水生态环境
收稿时间:2018-09-13

Comparative analysis of Lingma hydropreject construction and deep channel excavation schemes for lower reaches of Jinhua River
WANG Feng,ZHANG Ming,YOU Keshi and FANG Xiangzheng.Comparative analysis of Lingma hydropreject construction and deep channel excavation schemes for lower reaches of Jinhua River[J].Hydro-Science and Engineering,2019,0(5):108-113.
Authors:WANG Feng  ZHANG Ming  YOU Keshi and FANG Xiangzheng
Affiliation:1.Jinhua Port and Navigation Bureau, Jinhua 321000, China2.State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Nanjing Hydraulic Research Institute, Nanjing 210029, China
Abstract:The cascade hydropreject construction and waterway regulation are two development modes commonly used in the inland waterway navigation engineering. In practice, comprehensive comparison and demonstration is needed to optimize the development plan. By means of the hydrodynamic numerical calculation method, the effects of the Lingma hydropreject construction and deep excavation of waterway in the Jinhua River navigation development project are compared and analyzed, and the construction scheme is demonstrated and optimized in this paper. The analysis results show that if the maximum dredging depth is more than 5 m in the deep excavation of the waterway, the bare beach caused by the flow into the deep pool will bring damage to the environment and ecology. The Lingma cascade hydropreject construction scheme in the lower reaches of the Jinhua River can not only increase the navigation guarantee rate to more than 95%, but also significantly improve the water ecological environment and human landscape in the region. It is a necessary condition to achieve the goal of the Jinhua River class IV waterway construction.
Keywords:mountain waterway  waterway dredging  hydrodynamic calculation method  hydrological analysis  water ecological environment
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水运工程学报》浏览原始摘要信息
点击此处可从《水利水运工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号