An upgrade of the electron cyclotron heating system on DIII-D to almost 15 MW is being planned which will expand it from a system with six 1 MW 110 GHz gyrotrons to one with ten gyrotrons. A depressed collector 1.2 MW 110 GHz gyrotron is being commissioned as the seventh gyrotron. A new 117.5 GHz 1.5 MW depressed collector gyrotron has been designed, and the first article will be the eighth gyrotron. Two more are planned, increasing the system to ten total gyrotrons, and the existing 1 MW gyrotrons will subsequently be replaced with 1.5 MW gyrotrons.Communications and Power Industries completed the design of the 117.5 GHz gyrotron, and are now fabricating the first article. The design was optimized for a nominal 1.5 MW at a beam voltage of 105 kV, collector potential depression of 30 kV, and beam current of 50 A, but can achieve 1.8 MW at 60 A. The design of the collector permits modulation above 100 Hz by either the body or the cathode power supply, or both, while modulation below 100 Hz must use only the cathode power supply.General Atomics is developing solid-state power supplies for this upgrade: a solid-state modulator for the cathode power supply and a linear high voltage amplifier for the body power supply. The solid-state modulator has series-connected insulated-gate bipolar transistors that are switched at a fixed frequency by a pulse-width modulation regulator to control the output voltage. The design of the linear high voltage amplifier has series-connected transistors to control the output voltage, which was successfully demonstrated in a proof-of-principle test at 2 kV. The designs of complete power supplies are progressing.The design features of the 117.5 GHz 1.5 MW gyrotron and the solid-state cathode and body power supplies will be described and the current status and plans are presented.  相似文献   

2.
ECH (Electron Cyclotron Heating) for ITER will deliver into the plasma 20 MW of RF power. The procurement of the RF sources will be shared equally between the three following partners: Europe, Japan and Russia. Moreover, Europe decided to develop a RF source capable of 2 MW CW of RF power, based on the design of a coaxial gyrotron with a depressed collector. In order to be able to develop and test these RF sources, a Test Facility (TF) has been built at the CRPP premises in Lausanne (CH).The present paper will first remind the main operation conditions considered to test safely a gyrotron. The power supplies parameters allowing to fulfill these conditions will be reviewed. The core of the paper content will describe the newly installed Main High Voltage Power Supply (MHVPS), to be connected to the gyrotron cathode and capable of ?60 kV/80 A-CW. The principle, the characteristics, the on-site test results will be described at the light of the requirements imposed by the gyrotron testing. Particular aspects of the installation and commissioning on-site will be highlighted in comparison with the ITER environment. The synchronized operation of the MHVPS and the BPS (Body Power Supply) on dummy load, piloted through the TF remote control, will be presented and commented.Since the TF supply structure has been built integrating the particular conditions and requirements expected for ITER, a conclusion will summarize the performances obtained at the light of these criteria.  相似文献   

3.
The electron cyclotron heating system on DIII-D has been supporting experiments with six gyrotrons. The gyrotrons are connected to three power supplies: two have single modulators, each energizing two gyrotrons, while the third has three modulators that can energize three gyrotrons asynchronously. However, only two gyrotrons can be run synchronously due to the limitation of the high voltage dc power supply providing the input voltage to the modulators. These two configurations mimic proposed architectures of power systems for multiple gyrotron systems and demonstrate their advantages or disadvantages, which will be discussed in more detail. A fourth power system is being built as part of an upgrade to eight gyrotrons. The two future gyrotrons will have depressed collectors. A 1.2 MW gyrotron will be delivered in mid-2011 and the design of a 1.5 MW gyrotron has been initiated. This fourth power supply will have two modulators to independently energize the cathode of each gyrotron. Commercially available high voltage amplifiers will provide the body voltage. It will also have a solid-state crowbar instead of an ignitron crowbar. This power supply is described in more detail, as well as the testing performed on the solid-state crowbar to prove its performance.  相似文献   

4.
The neutral beam injection (NBI-1) system has been designed for providing a 300 s deuterium beam of 120 kV/65 A as an auxiliary heating and current drive system of the KSTAR (Korea Superconducting Tokamak Advanced Research) tokamak. The deuterium beam is produced from a long pulse ion source composed of a bucket-type plasma generator and a multi-aperture tetrode accelerator with the help of discharge power supplies and high voltage (HV) power supplies. The beamline components (BLCs) include a neutralizer with an optical multi-channel analyzer (OMA) section, a bending magnet (BM), an ion dump assembly, a movable calorimeter, beam scrapers, and a cryo-sorption pump system in a rectangular vacuum tank. A beam duct equipped with bellows and a voltage break is placed between the NBI vacuum tank and the KSTAR vacuum vessel. All data and parameters of the NBI system are controlled by a control and data acquisition (CODAQ) system through the EPICS based Ethernet interface.  相似文献   

5.
The Korean Superconducting Tokamak Advanced Research (KSTAR) superconducting magnet power supply is composed of a Poloidal Field Magnet Power Supply (PF MPS) and a Toroidal Field Magnet Power Supply (TF MPS). When the PF MPS is operated, it requires a large amount of power instantaneously from the KSTAR electric power system. To achieve the KSTAR operational goal, with a long pulse scenario, a peak power of 200 MVA is required and the total power demand for the KSTAR system can exceed 200 MVA. The available grid power is only 100 MVA at the KSTAR site. Increasing the available grid power was uneconomical and inefficient which is why NFRI are installing a Motor Generator (MG).National Fusion Research Institute (NFRI) has made a contract with Vitzrotech and Converteam to design, manufacture and install the MG. Converteam has designed the electromagnetic and mechanical specification of the MG and Variable Voltage Variable Frequency (VVVF) converter.In this paper we discuss the conceptual design, including energy saving and electrical capacity of the MG system and the performance of the MG to satisfy the KSTAR 300 s operation scenario. In addition, the manufacturing and installation plan for the KSTAR MG is discussed.  相似文献   

6.
The neutral beam injection (NBI) system was designed to provide plasma heating and current drive for high performance and long pulse operation of the Korean Superconducting Tokamak Advanced Research (KSTAR) device using two co-current beam injection systems. Each neutral beam injection system was designed to inject three beams using three ion sources and each ion source has been designed to deliver more than 2.0 MW of deuterium neutral beam power for the 100-keV beam energy. Consequently, the final goal of the KSTAR NBI system aims to inject more than 12 MW of deuterium beam power with the two NBI for the long pulse operation of the KSTAR. As an initial step toward the long pulse (~300 s) KSTAR NBI system development, the first neutral beam injection system equipped with one ion source was constructed for the KSTAR 2010 campaign and successfully commissioned. During the KSTAR 2010 campaign, a MW-deuterium neutral beam was successfully injected to the KSTAR plasma with maximum beam energy of 90 keV and the L-H transition was observed with neutral beam heating. In recent 2011 campaign, the beam power of 1.5 MW is injected with the beam energy of 95 keV. With the beam injection, the ion and electron temperatures increased significantly, and increase of the toroidal rotation speed of the plasma was observed as well. This paper describes the design, construction, commissioning results of the first NBI system leading the successful heating experiments carried in the KSTAR 2010 and 2011 campaign and the trial of 300-s long pulse beam extraction.  相似文献   

7.
This paper presents the numerical simulation of a double-beam magnetron injection gun (DB-MIG) and beam-wave interaction for 60 GHz, 500 kW gyrotron. The beam-wave interaction calculations, power and frequency growth estimation are performed by using PIC code MAGIC. The maximum output power of 510 kW at 41.5% efficiency, beam currents of 6 A and 12 A, electron beam velocity ratios of 1.41 and 1.25 and beam voltage of 69 kV are estimated. To obtain the design parameters, the DB-MIG with maximum transverse velocity spread less than 5% is designed. The computer simulations are performed by using the commercially available code EGUN and the in-house developed code MIGANS. The simulated results of DB-MIG design obtained by using the EGUN code are also validated with another trajectory code TRAK, which are in good agreement.  相似文献   

8.
The commissioning and the initial operation for the first plasma in the KSTAR device have been accomplished successfully without any severe failure preventing the device operation and plasma experiments. The commissioning is classified into four steps: vacuum commissioning, cryogenic cool-down commissioning, magnet system commissioning, and plasma discharge.Vacuum commissioning commenced after completion of the tokamak and basic ancillary systems construction. Base pressure of the vacuum vessel was about 3 × 10?6 Pa and that of the cryostat about 2.7 × 10?4 Pa, and both levels meet the KSTAR requirements to start the cool-down operation. All the SC magnets were cooled down by a 9 kW rated cryogenic helium facility and reached the base temperature of 4.5 K in a month. The performance test of the superconducting magnet showed that the joint resistances were below 3 nΩ and the resistance to ground after cool-down was over 1 GΩ. An ac loss test of each PF coil made by applying a dc biased sinusoidal current showed that the coupling loss was within the KSTAR requirement with the coupling loss time constant less than 35 ms for both Nb3Sn and NbTi magnets. All the superconducting magnets operated in stable without quench for long-time dc operation and with synchronized pulse operation by the plasma control system (PCS). By using an 84 GHz ECH system, second harmonic ECH assisted plasma discharges were produced successfully with loop voltage of less than 3 V. By the real-time feedback control, operation of 100 kA plasma current with pulse length up to 865 ms was achieved, which also meet the first plasma target of 100 kA and 100 ms. The KSTAR device will be operated to meet the missions of steady-state and high-beta achievement by system upgrades and collaborative researches.  相似文献   

9.
The electron cyclotron resonance heating(ECRH) system with a 60 GHz/200 k W/0.5 s gyrotron donated by the Culham Science Center is being developed on the J-TEXT tokamak for plasma heating, current drive and MHD studies. Simultaneously, an anode power supply(APS) has been rebuilt and tested for the output power control of the gyrotron, of which the input voltage is derived from an 80 k V negative cathode power supply. The control strategy by controlling the grid voltage of the tetrode TH5186 is applied to obtain an accurate anode climbing voltage, of which the output voltage can be obtained from 0-30 k V with respect to the cathode power supply. The characteristics of the APS, including control, protection, modulation, and output waveform, were tested with a100 k V/60 A negative cathode power supply, a dummy load and the ECRH control system. The results indicate that the APS can meet the requirements of the ECRH system on J-TEXT.  相似文献   

10.
The paper presents the electrical and thermo-mechanical design of single stage beam recovery system for 120 GHz, 1 MW gyrotron. The electrical study shows that the cylindrical shape single stage beam recovery system enhances the efficiency by 66.26%. The maximum power deposited to collector in depressed collector operation is 0.48 MW for electronic efficiency, 30% and 1.44 MW for DC electron beam. The thermo-mechanical analysis has been performed to evaluate the water cooling system. The cooling system has capability of accommodating a peak wall loading, 0.9 kW/cm2 at flow rate of 1500 l/min for safe operating time, 60 ms. Further, a high voltage analysis is also carried out to appraise the electric field distribution in the collector.  相似文献   

11.
In the framework of the EFDA task HCD-08-03-01, the ITER lower hybrid current drive (LHCD) system design has been reviewed. The system aims to generate 24 MW of RF power at 5 GHz, of which 20 MW would be coupled to the plasmas. The present state of the art does not allow envisaging a unitary output of the klystrons exceeding 500 kW, so the project is based on 48 klystron units, leaving some margin when the transmission lines losses are taken into account. A high voltage power supply (HVPS), required to operate the klystrons, is proposed. A single HVPS would be used to feed and operate four klystrons in parallel configuration. Based on the above considerations, it is proposed to design and develop twelve HVPS, based on pulse step modulator (PSM) technology, each rated for 90 kV/90 A. This paper describes in details, the typical electrical requirements and the conceptual design of the proposed HVPS for the ITER LHCD system.  相似文献   

12.
The energy of future neutral beam injector (NBI) heating systems of fusion power plants ranges from 1 to 2 MeV. They are based on powerful (several tens of MW) hydrogen negative ion electrostatic accelerators where electrodes are polarized by DC high-voltage. The beam line under vacuum is supplied by HV power supplies via a transmission line pressured under SF6 and a high voltage feedthrough called bushing. The paper presents results obtained over experimental campaigns dedicated to high voltage vacuum insulation for future NBI systems (ITER). It addresses the problematic of the electron field emission and the high voltage breakdown limit under vacuum between large electrode surfaces. The paper highlights the dependence of the electron emission (dark current) with the voltage and the background tank pressure: at low pressure (~1E?3 Pa in hydrogen), an important dark current of I  100 mA has been measured at 500 kV, while at higher pressure (~0.3 Pa in helium), the dark current has been nearly suppressed (less than 3 mA of dark current at 970 kV). The paper shows that a field induced gas adsorption process could occur on the emitting surfaces (cathode), and this process tends to lower the electron field emission current by increasing the work function of the electrode surface. The Fowler–Nordheim law applied to the measured dark current indicates about 70% of work function increase at 0.3 Pa in helium. Finally, a new high-voltage bushing concept relevant to the future NBI systems is presented; it is based on these experimental findings in high voltage vacuum insulation; the main feature of the new bushing concept is to take benefit of the field induced adsorption effect, i.e., the suppression of the dark current with helium gas, in the inner part of the bushing where the electric field intensity is highest.  相似文献   

13.
14.
A baking system for the Korea Superconducting Tokamak Advanced Research (KSTAR) plasma facing components (PFCs) is designed and operated to achieve vacuum pressure below 5 × 10?7 mbar in vacuum vessel with removing impurities. The purpose of this research is to prevent the fracture of PFC because of thermal stress during baking the PFC, and to accomplish stable operation of the baking system with the minimum life cycle cost. The uniformity of PFC temperature in each sector was investigated, when the supply gas temperature was varied by 5 °C per hour using a heater and the three-way valve at the outlet of a compressor. The alternative of the pipe expansion owing to hot gas and the cage configuration of the three-way valve were also studied. During the fourth campaign of the KSTAR in 2011, nitrogen gas temperature rose up to 300 °C, PFC temperature reached at 250 °C, the temperature difference among PFCs was maintained at below 8.3 °C, and vacuum pressure of up to 7.24 × 10?8 mbar was achieved inside the vacuum vessel.  相似文献   

15.
Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally.The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay.In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.  相似文献   

16.
电子回旋共振管是产生高功率毫米微波的真空电子器件,在可控热核聚变研究、雷达等领域中有重要的应用。针对可控热核聚变研究中1 MW/105 GHz回旋管加热系统阳极电源幅度可调且调制的要求,使用高频开关电源技术和脉冲步进调制技术(PSM)研制了全固态阳极高压电源。重点阐述了阳极高压电源实现稳压、调制、前沿时间可调功能的软件控制算法,并通过实验对设计进行了验证。该阳极高压电源具有单脉冲、多脉冲调制和六电平预置波形等3种模式输出功能;输出参数达到35 kV/200 mA,波形前沿3 ms内可调,最大调制频率为1 kHz,调节精度在100 V以内。设计的控制方法也可应用于其他大功率微波源。  相似文献   

17.
It is necessary to test it on a dummy coil, before using a magnet power supply (MPS) to energize a Poloidal Field (PF) coil in the Korea Superconducting Tokamak Advanced Research (KSTAR) device. The dummy coil should accept the same large current from the MPS as the PF coil and be within the capability of the utilities located at the KSTAR site. Therefore a coil design based on the characteristics of the MPS and other restrictive conditions needed to be made. There are three requirements to be met in the design: an electrical requirement, a structural requirement, and a water cooling requirement. The electrical requirement was that the coil should have an inductance of 40 mH. For the structural requirement, the material should be non magnetic. The coil support structure and water cooling manifold were made of SUS 304. The water cooling requirement was that there should be sufficient flow rate so that the temperature rise ΔT should not exceed 12 °C for operation at 12.5 kA for 5 min. Square cross-section hollow conductor with dimensions of 38.1 mm × 38.1 mm was used with a 25.4 mm center hole for cooling water. However, as a result of tests, it was found that the electrical and structural requirements were satisfied but that the water cooling was over designed. It is imperative that the verification will be redone for a test with 12.5 kA for 5 min.  相似文献   

18.
Korea Superconducting Tokamak Advanced Research (KSTAR) is upgraded for its KSTAR 3rd campaign for new target mission to produce the D-shaped plasma with a target plasma current of 500 kA and/or pulse length of 5 s. New Plasma Facing Components (PFCs) are installed which leads to the increase of the surface area of the vessel by a factor of about 5. The vacuum conditioning such as the vessel baking has been performed in order to remove various kinds of impurities including H2O, carbon and oxygen for the plasma. The total outgassing rate in the KSTAR 1st campaign was measured as 1.5 × 10?4 mbar ? s?1 which is increased by a factor of 3 (6.49 × 10?4 mbar ? s?1) in the KSTAR 3rd campaign. Nevertheless, the outgassing rates per unit area have been decreased from 9.31 × 10?5 mbar ? m?2 s?1 to 1.22 × 10?5 mbar ? m?2 s?1 due to the upgrade of baking system and series of baking operation.  相似文献   

19.
The RF based single driver ?ve ion source experiment test bed ROBIN (Replica Of BATMAN like source in INDIA) has been set up at Institute for Plasma Research (IPR), India in a technical collaboration with IPP, Garching, Germany. A hydrogen plasma of density 5 × 1012 cm?3 is expected in driver region of ROBIN by launching 100 kW RF power into the driver by 1 MHz RF generator. The cesiated source is expected to deliver a hydrogen negative ion beam of 10 A at 35 kV with a current density of 35 mA/cm2 as observed in BATMAN.In first phase operation of the ROBIN ion source, a hydrogen plasma has been successfully generated (without extraction system) by coupling 80 kW RF input power through a matching network with high power factor (cos θ > 0.8) and different plasma parameters have been measured using Langmuir probes and emission spectroscopy. The plasma density of 2.5 × 1011 cm?3 has been measured in the extraction region of ROBIN. For negative hydrogen ion beam extraction in second phase operation, extraction system has been assembled and installed with ion source on the vacuum vessel. The source shall be first operated in volume mode for negative ion beam extraction. The commissioning of the source with high voltage power supply has been initiated.  相似文献   

20.
For JET to fulfil its mission in preparing ITER operation, the installation of an electron cyclotron resonance heating system on JET would be desirable. The study described in this paper has investigated the feasibility of installing such a system on JET. The principal goals of such a system are: current drive over a range of radii for NTM stabilization, sawtooth control and current profile tailoring and central electron heating to equilibrate electron and ion temperatures in high performance discharges. The study concluded that a 12 gyrotron, 10 MW, system at the ITER frequency (170 GHz) adapted for fields of 2.7–3.3 T would be appropriate for the operation planned in JET. An antenna allowing toroidal and poloidal steering over a wide range is being designed, using the ITER upper launcher steering mechanism. The use of ITER diamond windows and transmission line technology is suggested while power supply solutions partially reusing existing JET power supplies are proposed. Detailed planning shows that such a system can be operational in about 5 years from the time that the decision to proceed is taken. The cost and required manpower associated with implementing such a system on JET has also been estimated.  相似文献   