1.
This paper presents an investigation of the applicability of a genetic approach for solving the construction site layout problem. This problem involves coordinating the use of limited site space to accommodate temporary facilities so that transportation cost of materials is minimized. The layout problem considered in this paper is characterized by affinity weights used to model transportation costs between facilities and by geometric constraints that limit their relative positions on site. The proposed genetic algorithm generates an initial population of layouts through a sequence of mutation operations and evolves the layouts of this population through a sequence of genetic operations aiming at finding an optimal layout. The paper concludes with examples illustrating the strength and limitations of the proposed algorithm in the cases of (1) loosely versus tightly constrained layouts with equal levels of interaction between facilities; (2) loosely versus tightly packed layouts with variable levels of interactions between facilities; and (3) loosely versus tightly constrained layouts. In most problems considered where the total-objects-to-site-area ratio did not exceed 60%, the algorithm returned close to optimal solutions in a reasonable time.  相似文献   

2.
Planning construction site layouts involves identifying the positions of temporary facilities on site, and accordingly it has a significant impact on the safety and efficiency of construction operations. Although available models are capable of minimizing the travel cost of resources on site, they do not consider safety as an important and separate objective in the optimization of site layouts. This paper presents the development of an expanded site layout planning model that is capable of maximizing construction safety and minimizing the travel cost of resources on site, simultaneously. The model incorporates newly developed concepts and performance criteria that enable the quantification of construction safety and travel cost of resources on site. The present model is developed in three main phases: (1) formulating decision variables and optimization objectives in this site layout planning problem; (2) identifying and satisfying all practical constraints in this optimization problem; and (3) implementing the model as a multiobjective genetic algorithm. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing construction site layouts and generating optimal trade-offs between safety and travel cost of resources on site.  相似文献   

3.
Airport expansion projects often require the presence and movement of construction labor and equipment near critical airport traffic areas. This close proximity between construction activities and airport operations needs to be carefully considered during the planning of construction site layouts in order to minimize and eliminate all potential construction-related hazards to aviation safety. This paper presents the development of a multiobjective optimization model for planning airport construction site layouts that is capable of minimizing construction-related hazards and minimizing site layout costs, simultaneously. The model incorporates newly developed optimization functions and metrics that enable: (1) maximizing the control of hazardous construction debris near airport traffic areas; (2) minimizing site layout costs including the travel cost of construction resources and the cost of debris control measures on airport sites; and (3) satisfying all operational safety constraints required by the federal aviation administration as well as other practical site layout constraints. The model is implemented using a multiobjective genetic algorithm and an application example is analyzed to demonstrate the use of the model and its capabilities in optimizing construction site layouts in airport expansion projects.  相似文献   

4.
Dynamic site layout planning requires identifying and updating the positions of all temporary construction facilities such as offices, storage areas, and workshops over the entire project duration. Existing models do not guarantee global optimal solutions because they focus on optimizing the planning and layout of successive construction stages in a chronological order, without considering the future implications of layout decisions made in early stages. This paper presents the development of an approximate dynamic programming model that is capable of searching for and identifying global optimal dynamic site layout plans. The model applies the concepts of approximate dynamic programming to estimate the future effects of layout decisions in early stages on future decisions in later stages. The model is developed in three main phases: (1) formulating the decision variables, geometric constraints, and objective function of the dynamic site layout planning problem; (2) modeling the problem using approximate dynamic programming; and (3) implementing and evaluating the performance of the model. An evaluation example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating global optimal solution for dynamic site layout planning of construction projects.  相似文献   

5.
Construction operations in airport expansion projects often attract wildlife species to critical airport traffic areas leading to an increase in the risk of wildlife–aircraft collision accidents. Airport operators and construction planners need to carefully consider and minimize these wildlife hazards during the planning of construction site layouts in order to comply with Federal Aviation Administration recommendations. This paper presents the development of an advanced optimization model for planning airport construction site layouts that is capable of minimizing the hazards of wildlife attractants and minimizing the site layout costs, simultaneously. The model incorporates newly developed concepts and performance criteria that enable (1) quantifying, controlling, and minimizing the hazards of construction-related wildlife attractants near airport traffic areas; and (2) minimizing the travel cost of construction resources and the cost of devices installed to control wildlife on airport construction sites, while complying with all relevant aviation safety constraints. The model is developed using a multiobjective genetic algorithm and an application example is analyzed to demonstrate the use of the model in optimizing airport construction site layouts and its unique capability of generating optimal trade-offs between wildlife control and site layout costs.  相似文献   

6.
Repetitive projects involve the repetition of activities along the stages of the project. Since the resources required to perform these activities move from one stage to the other, a main objective of scheduling these projects is to maintain the continuity of work of these resources so as to minimize the idle time of resources. This requirement, often referred to as work continuity constraints, involves a tradeoff between total project duration and the resource idle time. The contribution of this paper is threefold. First, we provide an extensive literature summary of the topic under study. Although most research papers deal with the scheduling of construction projects, we show that this can be extended to many other environments. Second, we propose an exact search procedure for scheduling repetitive projects with work continuity constraints. This algorithm iteratively shifts repeating activities further in time in order to decrease the resource idle time. We have embedded this recursive search procedure in a horizon-varying algorithm in order to detect the complete tradeoff profile between resource idle time and project duration. The procedure has been coded in Visual C++ and has been validated on a randomly generated problem set. Finally, we illustrate the concepts on three examples. First, the use of our new algorithm is illustrated on a small fictive problem example from literature. In a second example, we show that work continuity constraints involve a tradeoff between total project duration and the resource idle time. A last example describes the scheduling of a well-known real-life project that aims at the construction of a tunnel at the Westerschelde in The Netherlands.  相似文献   

7.
Fuzzy Optimal Model for Resource-Constrained Construction Scheduling   总被引:1,自引:0,他引:1  
Activity duration is uncertain due to the variation in the outside environment, such as weather, site congestion, productivity level, etc. Furthermore, resources for construction activities are limited in the real construction world so that scheduling must include resource allocation. A new optimal resource-constrained construction scheduling model is proposed in this paper, in which the effects of both uncertain activity duration and resource constraints are taken into account. Fuzzy set theory is used to model the uncertainties of activity duration. A genetic algorithm-based searching technique is adopted to search for the fuzzy optimal project duration under resource constraints. The model can effectively provide the optimal fuzzy profiles of project duration and resource amounts under the constraint of limited resources.  相似文献   

8.
A good site layout is vital to ensure the safety of the working environment and effective and efficient operations. Site layout planning has significant impacts on productivity, costs, and duration of construction. Construction site layout planning involves identifying, sizing, and positioning temporary and permanent facilities within the boundary of the construction site. Site layout planning can be viewed as a complex optimization problem. Although construction site layout planning is a critical process, systematical analysis of this problem is always difficult because of the existence of a vast number of trades and interrelated planning constraints. The problem has been solved using two distinct approaches: Optimization techniques and heuristics methods. Mathematical optimization procedures have been developed to produce optimal solutions, but they are only applicable for small-size problems. Artificial intelligent techniques have been used practically to handle real-life problems. On the other hand, heuristic methods have been used to produce good but not optimal solutions for large problems. In this paper, an optimization model has been developed for solving the site layout planning problem considering safety and environmental issues and actual distance between facilities. Genetic algorithms are used as an optimization bed for the developed model. In order to validate the performance of the developed model, a real-life construction project was tested. The obtained results proved that satisfactory solutions were obtained.  相似文献   

9.
Resource leveling aims at minimizing the resource usage fluctuations, which is accomplished by moving noncritical activities within their float. The project duration is fixed and is not affected by the leveling. Most of resource leveling techniques assumes that activities cannot be split. Although this assumption is valid for most construction activities, there are several activities that can be split to achieve better resource leveling. However, there is an added cost associated with splitting such as startup and restarting costs. This paper presents an optimization model for resource leveling that allows activity splitting and minimizes its associated costs. The objective is to level resources in a way that provides a tradeoff between the extra cost of acquiring and releasing resources versus the extra cost of activity splitting. The model can be used to determine at what values of the splitting cost, the preemption of an activity is recommended. One example problem is solved at the end of the paper in order to illustrate the proposed model.  相似文献   

10.
An optimal construction site layout planning (CSLP) is vital for project management. It can reduce the transportation flows and thus the costs of a project. Genetic algorithm (GA) is the most used algorithm to solve site layout problems, but randomly generated initial population in GA will decrease solution quality. Max-min ant system (MMAS) can offer a better initial population than the randomly generated initial population at the beginning of GA. In this study, a modified GA (MMAS-GA) formed by conjoining MMAS to the step of initialization of GA is proposed to solve CSLP problems. In order to reveal the computational capability of MMAS-GA to solve CSLP problems, the results of MMAS-GA and traditional GA are compared by solving an equal-area CSLP problem. The results showed that the proposed MMAS-GA algorithm provided a better optimal solution under the objective function of minimizing the transportation flows between the site facilities. The proposed MMAS-GA algorithm could assist project managers and planners to design optimal construction site layout, and thus to reduce construction costs.  相似文献   

11.
Layout of temporary construction facilities (objects) is an important activity during the planning process of construction projects. The construction area layout is a complex problem whose solution requires the use of analytical models. Existing popular models employ genetic algorithms that have proven to be useful tools in generating near optimal site layouts. This paper presents an alternative approach based on mathematical optimization that offers several important features and generates a global optimal solution. The construction area consists of an unavailable area that includes existing facilities (sites) and available area in which the objects can be located. The available area is divided into regions that are formulated using binary variables. The locations of the objects are determined by optimizing an objective function subject to a variety of physical and functional constraints. The objective function minimizes the total weighted distance between the objects and the sites as well as among the objects (if desired). The distance can be expressed as Euclidean or Manhattan distance. Constraints that ensure objects do not overlap are developed. The new approach, which considers a continuous space in locating the objects simultaneously, offers such capabilities as accommodating object adjacency constraints, facility proximity constraints, object–region constraints, flexible orientation of objects, visibility constraints, and nonrectangular objects, regions, and construction areas. Application of the model is illustrated using two examples involving single and multiple objects. The proposed model is efficient and easy to apply, and as such should be of interest to construction engineers and practitioners.  相似文献   

12.
Selecting construction methods, scheduling activities, and planning the use of site space are key to constructing a project efficiently. Site layout and activity scheduling have been tackled as independent problems. Their interdependence is often ignored at the planning stage and may be dealt with—if at all—when construction is underway. Problems that may have had easy solutions if dealt with earlier, may then be expensive to remedy. This paper addresses the combined problem termed “space scheduling” and presents an algorithmic time-space trade-off model for adjusting activity durations and start dates to decrease the need for space over congested time periods. The model characterizes resource space requirements over time and establishes a time-space relationship for each activity in the schedule, based on alternative resource levels. An example illustrates the presented algorithm that generates a feasible space schedule.  相似文献   

13.
The use of modular construction has gained wide acceptance in the industry. For a specific construction facility layout problem such as site precast standardized modular units, it requires the establishment of an on-site precast yard. Arranging the precast facilities within a construction site presents real challenge to site management. This complex task is further augmented with the involvement of several resources and different transport costs. A genetic algorithm (GA) model was developed for the search of a near-optimal layout solution. Another approach using mixed-integer programming (MIP) has been developed to generate optimal facility layout. These two approaches are applied to solve with an example in this paper to demonstrate that the solution quality of MIP outperforms that of GA. Further, another scenario with additional location constraints can also be solved readily by MIP, which, however, if modeled by GA, the solution process would be complicated. The study has highlighted that MIP can perform better than GA in site facility layout problems in which the site facilities and locations can be represented by a set of integer variables.  相似文献   

14.
Site layout planning can affect productivity and is crucial to project success. However, as construction is heterogeneous in the nature of its organizations, project designs, time constraints, environmental effects, etc., site layout planning for each project becomes unique. Affected by many uncertainties (variables) and variations, site layout planning is a typical multiobjective problem. To facilitate the decision-making process for these problems, a nonstructural fuzzy decision support system (NSFDSS) is proposed. NSFDSS integrates both experts’ judgment and computer decision modeling, making it suitable for the appraisal of complicated construction problems. The system allows assessments based on pairwise comparisons of alternatives using semantic operators that can provide a reliable assessment result even under the condition of insufficient precise information.  相似文献   

15.
Resources for construction activities are limited in the real construction world. To avoid the waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A multicriteria computational optimal scheduling model, which integrates the time∕cost trade-off model, resource-limited model, and resource leveling model, is proposed. A searching technique using genetic algorithms (GAs) is adopted in the model. Furthermore, the nondominated solutions are found by the multiple attribute decision-making method, technique for order preference by similarity to ideal solution. The model can effectively provide the optimal combination of construction durations, resource amounts, minimum direct project costs, and minimum project duration under the constraint of limited resources.  相似文献   

16.
Buffering is a common practice in project planning. Project managers or schedulers have used a time contingency to guarantee the completion time of either an activity or a project. This traditional buffering, however, often fails to protect the project schedule performance, resulting in an unnecessary resource idle time. To deal with this problem, reliability buffering, a simulation-based buffering strategy, is presented. Reliability buffering aims to generate a robust construction plan that protects against uncertainties by reducing the potential impact of construction changes. The effectiveness of reliability buffering is examined by simulating a dynamic project model that integrates the simulation approach with the network scheduling approach. The research results indicate that reliability buffering can help achieve a shorter project duration without driving up costs by pooling, resizing, relocating, and recharacterizing contingency buffers. A case study of bridge construction projects also demonstrates how construction projects can benefit from reliability buffering in real world settings. Although further validation is needed, reliability buffering can potentially impact the planning and control of construction projects by improving the consideration of construction feedbacks and characteristics in buffering, and serving as an input to a dynamic project model.  相似文献   

17.
The construction space scheduling problem has received relatively little attention from researchers and practitioners. We now have sophisticated methods of planning and analyzing the sequence of tasks within the work breakdown structure through time, but the problem of planning where on site those tasks are to be executed is not well-supported especially as those spaces are dynamic as the project progresses. We know that congestion on site reduces output and generates hazards, yet construction planners presently have to rely upon experience and intuition. The research reported here presents a decision support tool for construction project planners to help them address the space scheduling problem. After a review of recent developments in construction space scheduling, the concept of critical space analysis is presented. This forms the basis of decision support tools presented for marking up available space, allocating tasks to spaces, and analyzing and optimizing space loading in relation to the critical path—what we call space-time broking. Requirements capture and evaluation reports from construction planners suggest that the tools presented here have immediate practical relevance. The paper will, therefore, be of interest to both practitioners and researchers.  相似文献   

18.
Resource calendars specify nonworking days of driving resources involved in construction projects. As part of the resource availability constraints in critical path method (CPM) scheduling, resource calendars may postpone activity start time, extend activity duration, and hence prolong the total project duration. Ultimately, resource calendars bring about changes to the critical path identification. Research has yet to address how to incorporate the effects of multiple resource calendars on the total float determination. In this research, the popular P3 software is used as a tool for investigating the current practice of CPM scheduling under resource limit and calendar constraints. We assess P3’s advanced resource scheduling functions (including resource leveling and resource calendars) and identify P3’s potential errors in total float determination. Further, we propose a new method based on the forward pass analysis alone for accurately evaluating activity total float subject to resource calendar constraints. The application of the new method is illustrated with an activity-on-node case and a precedence-diagram-method case, with the results compared against those produced from P3. Our research has elucidated on some critical issues of resource-constrained scheduling in the application domain of construction project management. The findings will provide useful input for the vendors and users of the CPM software—which is not limited to P3—to improve the scheduling methodology as well as the accuracy of the resulting project schedules.  相似文献   

19.
Layout of temporary facilities on a construction site is essential to enhancing productivity and safety, and is a complex issue due to the unique nature of construction. This paper proposes a particle swarm optimization (PSO)-based methodology to solve the construction site unequal-area facility layout problem. A priority-based particle representation of the candidate solutions to the layout problem is proposed. The particle-represented solution in terms of priorities should be transformed to the specific layout plan with consideration of nonoverlap and geometric constraints. In addition, a modified solution space boundary handling approach is proposed for controlling particle updating with regard to the priority value range. Computational experiments are carried out to justify the efficiency of the proposed method and investigate its underlying performances. This study aims at providing an alternative and effective means for solving the construction site unequal-area layout problem by utilizing the PSO algorithm.  相似文献   

20.
Airport expansion projects often require the presence of construction personnel, material, and equipment near airport secure areas/facilities, leading to an increase in the level of risk to airport security. Construction planners and airport operators need to carefully study this challenge and implement active measures in order to minimize construction-related security breaches and comply with all relevant Federal Aviation Administration guidelines. This paper presents the development of an advanced multiobjective optimization model for planning airport construction site layouts that is capable of minimizing construction-related security breaches while simultaneously minimizing site layout costs. The model incorporates newly developed criteria and performance metrics that enable evaluating and maximizing the construction-related security level in operating airports. The model is developed using a multiobjective genetic algorithm, and an application example is analyzed to demonstrate the use of the model and its unique capability of generating a wide spectrum of optimal trade-offs between construction-related airport security and site layout costs.  相似文献   