1.
This study is focused on developing an automated site layout system for construction materials. The system, MaterialPlan, including a geographic information system (GIS) based cost estimates system integrated with material layout planning, is a new tool to assist managers in identifying suitable areas to locate construction materials. As tabulation of all project quantities is calculated using GIS, linkages are established between the graphical features of detailed design and the related estimating quantities. Based on information regarding quantities and locations of the materials required in the project, this study identifies the suitable site to store the materials. Using the concept of “searching by elimination,” the system develops a heuristic approach, modeling the process of human decision making to generate potential sites for placing the materials. An objective function called the proximity index is developed to determine the optimal site. In conclusion, MaterialPlan demonstrates that GIS is a promising tool for solving construction layout problems and thus opens up a new way of thinking for the management of spatial information in construction planning and design.  相似文献   

2.
An optimal construction site layout planning (CSLP) is vital for project management. It can reduce the transportation flows and thus the costs of a project. Genetic algorithm (GA) is the most used algorithm to solve site layout problems, but randomly generated initial population in GA will decrease solution quality. Max-min ant system (MMAS) can offer a better initial population than the randomly generated initial population at the beginning of GA. In this study, a modified GA (MMAS-GA) formed by conjoining MMAS to the step of initialization of GA is proposed to solve CSLP problems. In order to reveal the computational capability of MMAS-GA to solve CSLP problems, the results of MMAS-GA and traditional GA are compared by solving an equal-area CSLP problem. The results showed that the proposed MMAS-GA algorithm provided a better optimal solution under the objective function of minimizing the transportation flows between the site facilities. The proposed MMAS-GA algorithm could assist project managers and planners to design optimal construction site layout, and thus to reduce construction costs.  相似文献   

3.
Dynamic site layout planning requires identifying and updating the positions of all temporary construction facilities such as offices, storage areas, and workshops over the entire project duration. Existing models do not guarantee global optimal solutions because they focus on optimizing the planning and layout of successive construction stages in a chronological order, without considering the future implications of layout decisions made in early stages. This paper presents the development of an approximate dynamic programming model that is capable of searching for and identifying global optimal dynamic site layout plans. The model applies the concepts of approximate dynamic programming to estimate the future effects of layout decisions in early stages on future decisions in later stages. The model is developed in three main phases: (1) formulating the decision variables, geometric constraints, and objective function of the dynamic site layout planning problem; (2) modeling the problem using approximate dynamic programming; and (3) implementing and evaluating the performance of the model. An evaluation example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating global optimal solution for dynamic site layout planning of construction projects.  相似文献   

4.
A good site layout is vital to ensure the safety of the working environment and effective and efficient operations. Site layout planning has significant impacts on productivity, costs, and duration of construction. Construction site layout planning involves identifying, sizing, and positioning temporary and permanent facilities within the boundary of the construction site. Site layout planning can be viewed as a complex optimization problem. Although construction site layout planning is a critical process, systematical analysis of this problem is always difficult because of the existence of a vast number of trades and interrelated planning constraints. The problem has been solved using two distinct approaches: Optimization techniques and heuristics methods. Mathematical optimization procedures have been developed to produce optimal solutions, but they are only applicable for small-size problems. Artificial intelligent techniques have been used practically to handle real-life problems. On the other hand, heuristic methods have been used to produce good but not optimal solutions for large problems. In this paper, an optimization model has been developed for solving the site layout planning problem considering safety and environmental issues and actual distance between facilities. Genetic algorithms are used as an optimization bed for the developed model. In order to validate the performance of the developed model, a real-life construction project was tested. The obtained results proved that satisfactory solutions were obtained.  相似文献   

5.
Construction site layout is concerned with the existence, positioning, and timing of the temporary facilities that are used to carry out a construction project. Typically these problems are very complicated to formulate and difficult to solve. They are, however, very important to virtually any construction project, since the site layout can significantly affect the cost of the project. This paper describes the general site layout problem from both a theoretical and a practical point of view. It proposes genetic algorithms as a possible solution technique and includes a theoretical example of positioning temporary facilities. This is extended to a practical problem in which the cost of movement is modeled realistically using an augmented genetic algorithm. Some preliminary conclusions are drawn for the application of genetic algorithms to construction site layout problems.  相似文献   

6.
An important phase within the overall residential land development process is preliminary project planning, which is a highly coordinated effort involving a number of decisions that are made by a variety of individuals. One critical decision faced by the project owner and the development team, during the preliminary planning phase, is the initial selection of the most appropriate site for a proposed conceptual development plan. The scope of this paper deals with (1) formulating a model for the preliminary planning phase of residential site selection; and (2) developing an associated decision support system that can assist the decision makers during this phase of the project. The analytical hierarchy process was the decision making theory used in the site selection decision support system. Analytical hierarchy process uses a hierarchical structure comprising both quantitative and qualitative factors that are based on factual data and the knowledge and experience of the decision makers.  相似文献   

7.
The interactive, complicated system environment of a construction site renders conventional site layout planning and scheduling techniques to be inadequate in coping with materials handling system design in construction. In this paper, we present a university-industry joint endeavor for improving the effectiveness of the materials handling system on a precast viaduct construction project in Hong Kong by implementing the simplified discrete-event simulation approach (SDESA) along with its computer platform resulting from recent research. How to apply the simulation methodology of SDESA is elaborated step by step. Particular emphasis is placed on procedures of establishing a simulation model, validation of the simulation model, design of simulation experiments, and analysis of simulation results. With process flowchart, site layout plan, and process animation produced in a view-centric simulation environment, it is straightforward to establish, validate, and communicate the operations simulation. The research team convinced the project director, as well as field managers, of the functionality and effectiveness of operations simulation. The knowledge derived from simulation added to experiences of site managers in materials handling system design. With the aid of simulation, even junior engineers would be capable and confident to draw up an actionable construction plan that would lead to enhancement of cost effectiveness and productivity in the field.  相似文献   

8.
Planning construction site layouts involves identifying the positions of temporary facilities on site, and accordingly it has a significant impact on the safety and efficiency of construction operations. Although available models are capable of minimizing the travel cost of resources on site, they do not consider safety as an important and separate objective in the optimization of site layouts. This paper presents the development of an expanded site layout planning model that is capable of maximizing construction safety and minimizing the travel cost of resources on site, simultaneously. The model incorporates newly developed concepts and performance criteria that enable the quantification of construction safety and travel cost of resources on site. The present model is developed in three main phases: (1) formulating decision variables and optimization objectives in this site layout planning problem; (2) identifying and satisfying all practical constraints in this optimization problem; and (3) implementing the model as a multiobjective genetic algorithm. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing construction site layouts and generating optimal trade-offs between safety and travel cost of resources on site.  相似文献   

9.
EvoSite: Evolution-Based Model for Site Layout Planning   总被引:1,自引:0,他引:1  
Appropriate site layout of temporary facilities is crucial for enhancing the productivity and safety on construction sites. Site layout planning, however, is a complex problem, and researchers have attempted to solve it using a variety of optimization-based and heuristic-based techniques. In this paper, a genetic-algorithm-based model for site layout planning is presented. The advantages of the model stem from three main characteristics: (1) It applies to any user-defined site shape; (2) it accounts for the user preference in the relative closeness among the facilities; and (3) it incorporates a genetic algorithm procedure to search for the optimum layout in a manner that simulates natural evolution. Based on the proposed model, a comprehensive system for site layout planning (EvoSite) is developed. EvoSite uses an intuitive spreadsheet representation of the site and the facilities, and automates the evolution of layout solutions. Details of model development and implementation are described, and an example application is presented to demonstrate the capabilities of the EvoSite system. The advantages, limitations, and future extensions of EvoSite are then discussed.  相似文献   

10.
Efficient planning of materials procurement and storage on construction sites can lead to significant improvements in construction productivity and project profitability. Existing research studies focus on material procurement and storage layout as two separate planning tasks without considering their critical and mutual interdependencies. This paper presents the development of a new optimization model for construction logistics planning that is capable of simultaneously integrating and optimizing the critical planning decisions of material procurement and material storage on construction sites. The model utilizes genetic algorithms to minimize construction logistics costs that cover material ordering, financing, stock-out, and layout costs. The model incorporates newly developed algorithms to estimate the impact of potential material shortages on-site because of late delivery on project delays and stock-out costs. An application example is analyzed to demonstrate the capabilities of the construction logistics planning model in simultaneously optimizing material procurement decisions and storage layout plans.  相似文献   

11.
Airport expansion projects often require the presence and movement of construction labor and equipment near critical airport traffic areas. This close proximity between construction activities and airport operations needs to be carefully considered during the planning of construction site layouts in order to minimize and eliminate all potential construction-related hazards to aviation safety. This paper presents the development of a multiobjective optimization model for planning airport construction site layouts that is capable of minimizing construction-related hazards and minimizing site layout costs, simultaneously. The model incorporates newly developed optimization functions and metrics that enable: (1) maximizing the control of hazardous construction debris near airport traffic areas; (2) minimizing site layout costs including the travel cost of construction resources and the cost of debris control measures on airport sites; and (3) satisfying all operational safety constraints required by the federal aviation administration as well as other practical site layout constraints. The model is implemented using a multiobjective genetic algorithm and an application example is analyzed to demonstrate the use of the model and its capabilities in optimizing construction site layouts in airport expansion projects.  相似文献   

12.
Selecting construction methods, scheduling activities, and planning the use of site space are key to constructing a project efficiently. Site layout and activity scheduling have been tackled as independent problems. Their interdependence is often ignored at the planning stage and may be dealt with—if at all—when construction is underway. Problems that may have had easy solutions if dealt with earlier, may then be expensive to remedy. This paper addresses the combined problem termed “space scheduling” and presents an algorithmic time-space trade-off model for adjusting activity durations and start dates to decrease the need for space over congested time periods. The model characterizes resource space requirements over time and establishes a time-space relationship for each activity in the schedule, based on alternative resource levels. An example illustrates the presented algorithm that generates a feasible space schedule.  相似文献   

13.
Dynamic Layout Planning Using a Hybrid Incremental Solution Method   总被引:1,自引:0,他引:1  
Efficiently using site space to accommodate resources throughout the duration of a construction project is a critical problem. It is termed the “dynamic layout planning” problem. Solving it involves creating a sequence of layouts that span the entire project duration, given resources, the timing of their presence on site, their changing demand for space over time, constraints on their location, and costs for their relocation. A dynamic layout construction procedure is presented here. Construction resources, represented as rectangles, are subjected to two-dimensional geometric constraints on relative locations. The objective is to allow site space to all resources so that no spatial conflicts arise, while keeping distance-based adjacency and relocation costs minimal. The solution is constructed stepwise for consecutive time frames. For each resource, selected heuristically one at a time, constraint satisfaction is used to compute sets of feasible positions. Subsequently, a linear program is solved to find the optimal position for each resource so as to minimize all costs. The resulting sequence of layouts is suboptimal in terms of the stated global objective, but the algorithm helps the layout planner explore better alternative solutions.  相似文献   

14.
Currently there are no formal decision tools or guidelines to assist owners and project managers in choosing delivery systems and project strategies that would allow significant reductions in the project cycle time. The development of a decision aid that would allow a project manager to prioritize and apply project cycle reduction techniques would be a valuable tool for achieving project cycle time reduction in projects. This paper presents a new high performance project delivery system called “project manager’s game planner” (PMGP) designed to assist a decision maker in identifying and utilizing an optimal set of radical reduction techniques (RRTs) with the greatest potential for success in achieving cycle time reduction. Additionally, the PMGP can assist the user in identifying the top RRTs during any of the five project phases: preproject planning, design, material management, construction, and start-up. Most projects can utilize this PMGP to improve the project performance whether to achieve significant cycle time reduction or to simply achieve effective project execution.  相似文献   

15.
The need to match project managers’ (PMs) performance measures onto projects of both unique and similar characteristics has long since been acknowledged by researchers. The need for these measures to reflect the various phases of the project life cycle has also been contended in the recent past. Here, a competency-based multidimensional conceptual model is proposed for mass house building projects (MHBPs). The model reflects both performance behaviors and outcome in predicting the PMs’ performances at the conceptual, planning, design, tender, construction, and operational phases of the project life cycle. Adopting a positivist approach, data elicited for the construction phase is analyzed using multiple regression techniques (stepwise selection). Out of a broad range of behavioral metrics identified as the independent variables, the findings suggest the best predictors of PMs’ performances in MHBPs at the construction phase are: job knowledge in site layout techniques for repetitive construction works; dedication in helping works contractors achieve works schedule; job knowledge of appropriate technology transfer for repetitive construction works; effective time management practices on house units; ability to provide effective solution to conflicts, simultaneously maintaining good relationships; ease with which works contractors are able to approach the PM and volunteering to help works contractors solve personal problems. ANOVA, multicollineriality, Durbin–Watson, and residual analysis, confirm the goodness of fit. Validation of the model also reflected reasonably high predictive accuracy suggesting the findings could be generalized. These results indicate that the model can be a reliable tool for predicting the performance of PMs in MHBPs.  相似文献   

16.
The construction space scheduling problem has received relatively little attention from researchers and practitioners. We now have sophisticated methods of planning and analyzing the sequence of tasks within the work breakdown structure through time, but the problem of planning where on site those tasks are to be executed is not well-supported especially as those spaces are dynamic as the project progresses. We know that congestion on site reduces output and generates hazards, yet construction planners presently have to rely upon experience and intuition. The research reported here presents a decision support tool for construction project planners to help them address the space scheduling problem. After a review of recent developments in construction space scheduling, the concept of critical space analysis is presented. This forms the basis of decision support tools presented for marking up available space, allocating tasks to spaces, and analyzing and optimizing space loading in relation to the critical path—what we call space-time broking. Requirements capture and evaluation reports from construction planners suggest that the tools presented here have immediate practical relevance. The paper will, therefore, be of interest to both practitioners and researchers.  相似文献   

17.
The use of modular construction has gained wide acceptance in the industry. For a specific construction facility layout problem such as site precast standardized modular units, it requires the establishment of an on-site precast yard. Arranging the precast facilities within a construction site presents real challenge to site management. This complex task is further augmented with the involvement of several resources and different transport costs. A genetic algorithm (GA) model was developed for the search of a near-optimal layout solution. Another approach using mixed-integer programming (MIP) has been developed to generate optimal facility layout. These two approaches are applied to solve with an example in this paper to demonstrate that the solution quality of MIP outperforms that of GA. Further, another scenario with additional location constraints can also be solved readily by MIP, which, however, if modeled by GA, the solution process would be complicated. The study has highlighted that MIP can perform better than GA in site facility layout problems in which the site facilities and locations can be represented by a set of integer variables.  相似文献   

18.
Construction operations in airport expansion projects often attract wildlife species to critical airport traffic areas leading to an increase in the risk of wildlife–aircraft collision accidents. Airport operators and construction planners need to carefully consider and minimize these wildlife hazards during the planning of construction site layouts in order to comply with Federal Aviation Administration recommendations. This paper presents the development of an advanced optimization model for planning airport construction site layouts that is capable of minimizing the hazards of wildlife attractants and minimizing the site layout costs, simultaneously. The model incorporates newly developed concepts and performance criteria that enable (1) quantifying, controlling, and minimizing the hazards of construction-related wildlife attractants near airport traffic areas; and (2) minimizing the travel cost of construction resources and the cost of devices installed to control wildlife on airport construction sites, while complying with all relevant aviation safety constraints. The model is developed using a multiobjective genetic algorithm and an application example is analyzed to demonstrate the use of the model in optimizing airport construction site layouts and its unique capability of generating optimal trade-offs between wildlife control and site layout costs.  相似文献   

19.
Several efforts have been made by many researchers to develop a model for schedule and cost integration in construction projects, but it is difficult to integrate and manage schedule and cost in an actual construction site using such a model. The integrated schedule and cost model developed in this study (1) enables the planning and control of repetitive construction processes and (2) can be used by a project manager in an actual construction site. Furthermore, an integrated schedule and cost model for the core wall construction, which is an important repetitive process in the recently booming high-rise building construction in terms of scheduling, was developed using the integration model developed in this study. It is expected that the integrated schedule and cost model developed can allow project managers to integrate the schedule and cost of repetitive construction processes more effectively and support the project managers’ decision-making.  相似文献   

20.
Site layout planning is a complicated issue because of the vast number of trades and interrelated planning constraints. To unfold its complexity, this paper aims to confine the study to a particularly defined area of construction: the structural concrete-frame construction stage of public housing projects. In this study, optimization of the tower crane and supply locations is targeted, as they are the major site facilities for high-rise building construction. A site layout genetic algorithm model is developed and a practical example is presented. The optimization results of the example are very promising and demonstrate the application value of the model.  相似文献   