Due to an increasingly competitive environment, construction companies are becoming more sophisticated, narrowing their focus, and becoming specialists in certain types of construction. This specialization requires more focused scheduling tools that prove to be better for certain type of projects. The critical path method (CPM) is the most utilized scheduling tool in the construction industry. However, for certain types of projects, CPM's usefulness decreases, because it becomes complex and difficult to use and understand. Alternative scheduling tools designed to be used with specific types of projects can prove to be more practical than CPM solutions. This paper provides a comparison of the CPM and a specialized tool, the linear scheduling model, by identifying critical attributes needed by any scheduling tool both at the higher management level and at the project level. Two project examples are scheduled with each method, and differences are discussed. Conclusions support that specialization of scheduling tools could be beneficial for the project manager and the project.  相似文献   

2.
Repetitive scheduling methods are more effective than traditional critical path methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit-based algorithm for the planning and scheduling of repetitive projects is developed. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The algorithm takes into consideration: (1) the logical relationship of activity groups in a repetitive project; (2) the usage of various resource crews in an activity group; (3) the maintaining of resource continuity; and (4) the time and cost for the routing of resource crews. A sample case study and a case study of a sewer system project are conducted to validate the algorithm, as well as to demonstrate its application. Results and findings are reported.  相似文献   

3.
While the critical path method (CPM) has been useful for scheduling construction projects, years of practice and research have highlighted serious drawbacks that hinder its use as a decision support tool. This paper argues that many of CPM drawbacks stem from the rough level of detail at which the analysis is conducted, where activities’ durations are considered as continuous blocks of time. The paper thus proposes a new critical path segments (CPS) mechanism with a finer level of granularity by decomposing the duration of each activity into separate time segments. Three cases are used to prove the benefits of using separate time segments in avoiding complex network relationships, accurately identifying all critical path fluctuation, better allocation of limited resources, avoiding multiple-calendar problems, and accurate analysis of project delays. The paper discusses the proposed CPS mechanism and comments on several issues related to its calculation complexity, its impact on existing procedures, and future extensions. This research is more beneficial to researchers and has the potential to revolutionize scheduling computations to resolve CPM drawbacks.  相似文献   

4.
Network scheduling is typically performed in three phases—network creation, analysis, and development. Although the critical path method (CPM) constitutes a well-established logic in network analysis, human intuition and experience are required for the creation and development of the network. Because of this, a variety of alternative CPM networks can be created in scheduling the same project. The use of the most desirable network can lead to a considerable reduction in the duration of the projects. This can be achieved by accurately identifying activities and linking them in an appropriate manner. Many researchers insisted that network scheduling lacks efficiency in scheduling repetitive-unit projects. Because of this, many scheduling methods have been developed to model such types of projects. However, most are not network based and require a large amount of input data, although most leading scheduling software remains network based and field engineers desire networklike forms of the schedule. In an effort to overcome this limitation, this paper presents a procedure for creating and developing networks for repetitive-unit projects. This network-based model incorporates a two-dimensional arrangement of activities, resource-space coordinates, for ease in creating a network and optimizes the activity linkage, thus resulting in the most desirable results. The model is applied to a typical repetitive-unit project to illustrate the use and capabilities of the model. The model can serve as an aid for inexperienced schedulers in creating a network as well as its optimization. An experienced scheduler can also check the desirability of his or her own created network via the use of this model.  相似文献   

5.
Many projects, such as the construction of roadways, pipelines, and high‐rise buildings, involve repetitive activities. A method for scheduling such work, the Linear Scheduling Method (LSM) is presented. In an LSM schedule, the repetitive activities are plotted as lines of constant or varying slopes on two axes, distance versus time. Discrete activities may be shown at their appropriate times and locations and then referenced to a network schedule for additional detail. The Linear Scheduling Method is illustrated by applying it to an actual roadway construction project. The simplicity of the system and advantages for certain types of projects are revealed. A sample schedule is used to derive information that is comparable to what may be obtained from an equivalent CPM network.  相似文献   

6.
Critical path analysis on a project network having non-finish-to-start (FS) logical relationships with lags is generally referred to as precedence diagram method (PDM). A PDM-based scheduling analysis is facilitated by mainstream project scheduling software (such as P3). However, PDM compounds total float determination and interpretation, potentially causing anomalous effects on critical path identification. In the present research, we generalize those particular circumstances that entail applying non-FS logical relationships on construction projects. We then propose generic transform schemes such that non-FS relationships in a PDM network can be detected and transformed—automatically—into equivalent FS. Moreover, we provide analytical proofs for the transform schemes being proposed to justify the logical equivalency between the original PDM network and the transformed activity-on-node (AON) network only having FS logical relationships. A PDM network example demonstrates that confusions would arise in interpreting P3’s critical path analysis results, but not in the case of the transformed AON counterpart. In conclusion, the transform schemes being proposed lead to better understanding of the scheduling results when critical path analysis is performed on a PDM network. This also paves the way for conducting further sophisticated scheduling analysis (such as resource loading or Monte Carlo simulation) on a PDM network.  相似文献   

7.
Published criticism in recent years concerning the inadequacy of Critical Path Method (CPM) as a project planning tool is identified and grouped under six major headings with reference to the publications in which the criticism were contained. These are answered from the writer's field experience and from experiences published by other authors. The object of the analysis is to see whether or not CPM as a project planning tool can meet the required functions of planning in construction, including consideration of legal and contractual framework and the complex and interdisciplinary nature of the project environment. The analysis reveals that, despite numerous criticism, project and construction planning should be done using CPM scheduling. Main factors affecting successful planning are realistic estimation of the productivity of crews in the context of expected job‐management efficiency conditions, and inclusion of sufficient time buffers between dissimilar trades. CPM is found to be equally useful as a planning tool for linear or repetitive projects. The limitations of this technique are identified in terms of the defined planning functions in the engineering phase of capital projects. A broad model for management of the engineering phase in revenue‐generating projects is suggested.  相似文献   

8.
Resource calendars specify nonworking days of driving resources involved in construction projects. As part of the resource availability constraints in critical path method (CPM) scheduling, resource calendars may postpone activity start time, extend activity duration, and hence prolong the total project duration. Ultimately, resource calendars bring about changes to the critical path identification. Research has yet to address how to incorporate the effects of multiple resource calendars on the total float determination. In this research, the popular P3 software is used as a tool for investigating the current practice of CPM scheduling under resource limit and calendar constraints. We assess P3’s advanced resource scheduling functions (including resource leveling and resource calendars) and identify P3’s potential errors in total float determination. Further, we propose a new method based on the forward pass analysis alone for accurately evaluating activity total float subject to resource calendar constraints. The application of the new method is illustrated with an activity-on-node case and a precedence-diagram-method case, with the results compared against those produced from P3. Our research has elucidated on some critical issues of resource-constrained scheduling in the application domain of construction project management. The findings will provide useful input for the vendors and users of the CPM software—which is not limited to P3—to improve the scheduling methodology as well as the accuracy of the resulting project schedules.  相似文献   

9.
Linear repetitive construction projects require large amounts of resources which are used in a sequential manner and therefore effective resource management is very important both in terms of project cost and duration. Existing methodologies such as the critical path method and the repetitive scheduling method optimize the schedule with respect to a single factor, to achieve minimum duration or minimize resource work breaks, respectively. However real life scheduling decisions are more complicated and project managers must make decisions that address the various cost elements in a holistic way. To respond to this need, new methodologies that can be applied through the use of decision support systems should be developed. This paper introduces a multiobjective linear programming model for scheduling linear repetitive projects, which takes into consideration cost elements regarding the project’s duration, the idle time of resources, and the delivery time of the project’s units. The proposed model can be used to generate alternative schedules based on the relative magnitude and importance of the different cost elements. In this sense, it provides managers with the capability to consider alternative schedules besides those defined by minimum duration or maximizing work continuity of resources. The application of the model to a well known example in the literature demonstrates its use in providing explicatory analysis of the results.  相似文献   

10.
A general mathematical formulation is presented for the scheduling of construction projects and is applied to the problem of highway construction scheduling. Repetitive and nonrepetitive tasks, work continuity constraints, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modeled. An optimization formulation is presented for the construction project scheduling problem, with the goal of minimizing the direct construction cost. The nonlinear optimization is then solved by the neural dynamics model developed recently by Adeli and Park. For any given construction duration, the model yields the optimum construction schedule for minimum construction cost automatically. By varying the construction duration, one can solve the cost-duration trade-off problem and obtain the global optimum schedule and the corresponding minimum construction cost. The new construction scheduling model provides the capabilities of both the critical path method (CPM) and linear scheduling method (LSM) approaches. In addition, it provides features desirable for repetitive projects, such as highway construction, and allows schedulers greater flexibility. It is particularly suitable for studying the effects of change order on the construction cost. This research provides the mathematical foundation for development of a new generation of more general, flexible, and accurate construction scheduling systems.  相似文献   

11.
This study evaluates the resource-constrained critical path method (RCPM), which the writers have recently proposed. RCPM establishes a critical path method (CPM)-like, resource-constrained schedule by resource-dependent activity relationships (or resource links) that the five-step RCPM technique identifies. With its CPM-like feature, RCPM provides the critical path and float data that are not available in traditional resource-constrained scheduling techniques. In addition, RCPM provides more flexibility to the schedule through identified alternative schedules, which allow certain activities to be executed beyond their late finish times without delaying the project completion. This paper evaluates the RCPM’s performance by comparing it with five related previous studies. A brief review of each study is also included in this paper. This comparison shows that RCPM performs well in identifying resource links and alternative schedules, compared to other methods. This study is of interest to academics because it highlights the advantages and disadvantages of different algorithms that have attempted to overcome present problems in traditional resource-constrained scheduling techniques.  相似文献   

12.
In this paper, a practical method is developed in an attempt to address the fundamental matters and limitations of existing methods for critical-path method (CPM) based resource scheduling, which are identified by reviewing the prior research in resource-constrained CPM scheduling and repetitive scheduling. The proposed method is called the resource-activity critical-path method (RACPM), in which (1) the dimension of resource in addition to activity and time is highlighted in project scheduling to seamlessly synchronize activity planning and resource planning; (2) the start/finish times and the floats are defined as resource-activity attributes based on the resource-technology combined precedence relationships; and (3) the “resource critical” issue that has long baffled the construction industry is clarified. The RACPM is applied to an example problem taken from the literature for illustrating the algorithm and comparing it with the existing method. A sample application of the proposed RACPM for planning a footbridge construction project is also given to demonstrate that practitioners can readily interpret and utilize a RACPM schedule by relating the RACPM to the classic CPM. The RACPM provides schedulers with a convenient vehicle for seamlessly integrating the technology/process perspective with the resource use perspective in construction planning. The effect on the project duration and activity floats of varied resource availability can be studied through running RACPM on different scenarios of resources. This potentially leads to an integrated scheduling and cost estimating process that will produce realistic schedules, estimates, and control budgets for construction.  相似文献   

13.
The heuristic method is one of the methods used for the scheduling of resource-constrained projects. This method is commonly used in programming the projects with high number of activities and resources such as construction investments. This paper investigates the effectiveness of three heuristic method priority rules applied in the resource scheduling of ten Turkish housing estate projects which were scheduled according to three preselected priority rules [maximum remaining path length (MRPL), latest finish time (LFT), and minimum slack time (MNSLCK)] in resource-constrained conditions. The performance of each priority rule was evaluated in relation to the duration of the project. The results revealed that MRPL priority reduced the project duration to minimum in six projects, whereas LFT priority yielded the best duration results in three projects and MNSLCK priority in only one project.  相似文献   

14.
The analysis of project schedules is among the central tasks of construction managers. Parallel to the well-known critical path method, linear scheduling techniques have been researched. The two most fully developed existing methods, the linear scheduling model and the repetitive scheduling method, are reviewed. Based on a discussion of a published example, the new mathematical analysis method for linear and repetitive schedules is introduced. The productivity scheduling method is based on singularity functions that provide a flexible and powerful mathematical model for construction activities and their buffers that are characterized by their linear or repetitive nature. The steps of formulating initial equations, stacking and consolidating them, and deriving information about their criticality are described in detail. The mathematical approach of the new method allows an integrated treatment of activities regardless of the number of changes in productivity within them and does not depend on the graphical representation of the schedule.  相似文献   

15.
Observant CPM schedulers in the early years of CPM application, the 1960s, noted that there were often familiar steps inherent in scheduling similar projects. This similarity occurred in the development of housing neighborhoods, such as New Town of Columbia, Maryland; schools, as in the Philadelphia School District Program involving 200 schools; and in the review process for projects during the preconstruction phase in large cities, namely Philadelphia and New York. In these situations, the development of a prototypical network provided a cost‐effective method of applying network scheduling to major programs. These applications are described in the form of case studies, and a recent application to the King Khalid Military City Housing Program is noted. An alternate manual approach to repetitive scheduling in highrise construction, the vertical production method developed in the 1970s, is also described.  相似文献   

16.
This paper describes a stochastic simulation-based scheduling system (S3) that: (1) integrates the deterministic critical path method (CPM), the probabilistic program evaluation and review technique (PERT), and the stochastic discrete event simulation (DES) approaches into a single system and lets the scheduler make an informed decision as to which method is better suited to the company’s risk-taking culture; (2) automatically determines the minimum number of simulation runs in DES mode and therefore optimizes the simulation process; and (3) provides a terminal method that tests the statistical significance of the differences between simulations, hence eliminating outliers and therefore increasing the accuracy of the DES process. The system is based on an earlier version of the system called stochastic project scheduling simulation and makes use of all the capabilities of this system. The study is of value to practitioners because S3 produces a realistic prediction of the probability of completing a project in a specified time. The study is also of relevance to researchers in that it allows researchers to compare the outcome of CPM, PERT, and DES under different conditions such as different variability or skewness in the activity duration data, the configuration of the network, or the distribution of the activity durations.  相似文献   

17.
This paper presents the development of a novel probabilistic scheduling model that enables fast and accurate risk evaluation for large-scale construction projects. The model is designed to overcome the limitations of existing probabilistic scheduling methods, including the inaccuracy of the program evaluation and review technique (PERT) and the long computational time of the Monte Carlo simulation method. The model consists of three main modules: PERT model; fast and accurate multivariate normal integral method; and a newly developed approximation method. The new approximation method is designed to focus the risk analysis on the most significant paths in the project network by identifying and removing insignificant paths that are either highly correlated or have high probability of completion time. The performance of the new model is analyzed using an application example. The results of this analysis illustrate that the new model was able to reduce the computational time for a large-scale construction project by more than 94% while keeping the error of its probability estimates to less than 3%, compared with Monte Carlo Simulation methods.  相似文献   

18.
This paper presents a multiobjective optimization model for the planning and scheduling of repetitive construction projects. The model enables construction planners to generate and evaluate optimal construction plans that minimize project duration and maximize crew work continuity, simultaneously. The computations in the present model are organized in three major modules: scheduling, optimization, and ranking modules. First, the scheduling module uses a resource-driven scheduling algorithm to develop practical schedules for repetitive construction projects. Second, the optimization module utilizes multiobjective genetic algorithms to search for and identify feasible construction plans that establish optimal tradeoffs between project duration and crew work continuity. Third, the ranking module uses multiattribute utility theory to rank the generated plans in order to facilitate the selection and execution of the best overall plan for the project being considered. An application example is analyzed to illustrate the use of the model demonstrate its new capabilities in optimizing the planning and scheduling of repetitive construction projects.  相似文献   

19.
The application of network techniques of project scheduling to repetitive projects has been criticized for the inability of network techniques to help maintain work continuity. Moreover, current network techniques require a large number of activities to represent a repetitive project and presume that there is only one logical sequence. This makes schedules time consuming to develop as well as maintain. Further, the logic chosen by the planner might be far from the shortest possible duration. This paper, utilizing the soft logic sequencing principles developed by Fan et al., develops a system which provides an easy input module in addition to scheduling and work-continuity-maintenance modules. The system eases the network generation and update processes, which in turn provides the shortest possible duration logics and the start and finish dates required to maintain work continuity.  相似文献   

20.
Traditional scheduling and progress control techniques such as bar charts and the critical path method (CPM) fail to provide information pertaining to the spatial aspects of a construction project. A system called PMS-GIS (Progress Monitoring System with Geographical Information Systems) was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. In PMS-GIS, the architectural design is executed using a computer-aided drafting (CAD) program (AutoCAD), the work schedule is generated using a project management software (P3), the design and schedule information (including percent complete information) are plugged into a GIS package (ArcViewGIS), and for every update, the system produces a CPM-generated bar chart alongside a 3D rendering of the project marked for progress. The GIS-based system developed in this study helps to effectively communicate the schedule∕progress information to the parties involved in the project, because they will be able to see in detail the spatial aspects of the project alongside the schedule.  相似文献   