1.
Site layout planning can affect productivity and is crucial to project success. However, as construction is heterogeneous in the nature of its organizations, project designs, time constraints, environmental effects, etc., site layout planning for each project becomes unique. Affected by many uncertainties (variables) and variations, site layout planning is a typical multiobjective problem. To facilitate the decision-making process for these problems, a nonstructural fuzzy decision support system (NSFDSS) is proposed. NSFDSS integrates both experts’ judgment and computer decision modeling, making it suitable for the appraisal of complicated construction problems. The system allows assessments based on pairwise comparisons of alternatives using semantic operators that can provide a reliable assessment result even under the condition of insufficient precise information.  相似文献   

2.
The interactive, complicated system environment of a construction site renders conventional site layout planning and scheduling techniques to be inadequate in coping with materials handling system design in construction. In this paper, we present a university-industry joint endeavor for improving the effectiveness of the materials handling system on a precast viaduct construction project in Hong Kong by implementing the simplified discrete-event simulation approach (SDESA) along with its computer platform resulting from recent research. How to apply the simulation methodology of SDESA is elaborated step by step. Particular emphasis is placed on procedures of establishing a simulation model, validation of the simulation model, design of simulation experiments, and analysis of simulation results. With process flowchart, site layout plan, and process animation produced in a view-centric simulation environment, it is straightforward to establish, validate, and communicate the operations simulation. The research team convinced the project director, as well as field managers, of the functionality and effectiveness of operations simulation. The knowledge derived from simulation added to experiences of site managers in materials handling system design. With the aid of simulation, even junior engineers would be capable and confident to draw up an actionable construction plan that would lead to enhancement of cost effectiveness and productivity in the field.  相似文献   

3.
An optimal construction site layout planning (CSLP) is vital for project management. It can reduce the transportation flows and thus the costs of a project. Genetic algorithm (GA) is the most used algorithm to solve site layout problems, but randomly generated initial population in GA will decrease solution quality. Max-min ant system (MMAS) can offer a better initial population than the randomly generated initial population at the beginning of GA. In this study, a modified GA (MMAS-GA) formed by conjoining MMAS to the step of initialization of GA is proposed to solve CSLP problems. In order to reveal the computational capability of MMAS-GA to solve CSLP problems, the results of MMAS-GA and traditional GA are compared by solving an equal-area CSLP problem. The results showed that the proposed MMAS-GA algorithm provided a better optimal solution under the objective function of minimizing the transportation flows between the site facilities. The proposed MMAS-GA algorithm could assist project managers and planners to design optimal construction site layout, and thus to reduce construction costs.  相似文献   

4.
Efficient planning of materials procurement and storage on construction sites can lead to significant improvements in construction productivity and project profitability. Existing research studies focus on material procurement and storage layout as two separate planning tasks without considering their critical and mutual interdependencies. This paper presents the development of a new optimization model for construction logistics planning that is capable of simultaneously integrating and optimizing the critical planning decisions of material procurement and material storage on construction sites. The model utilizes genetic algorithms to minimize construction logistics costs that cover material ordering, financing, stock-out, and layout costs. The model incorporates newly developed algorithms to estimate the impact of potential material shortages on-site because of late delivery on project delays and stock-out costs. An application example is analyzed to demonstrate the capabilities of the construction logistics planning model in simultaneously optimizing material procurement decisions and storage layout plans.  相似文献   

5.
A multimedia-supported case study is presented that deals with a large-scale civil engineering project. This case study is based on the complete analysis, design, and construction files of the developer of the project. The multimedia instructional tool has integrated different disciplines and input from the project manager, senior students, and instructors of different disciplines. This multimedia tool includes hypertext links to modular and stratified information. Information is made available through the user's control in a logical, interactive, deductive, and disciplinary way that follows the flow of a civil engineering project. Text, graphics, and videos are included. The multimedia tool presents a teaching tool that enables senior class civil engineering students to learn about planning, design, and construction phases of a civil engineering project, as well as their integration. The in-class use of the tool and project discussions help the students to relate better their previous academic knowledge to “real-life” problems, enhance their creativity, and increase the level of retention of the new knowledge acquired. Future enhancements and learning possibilities are discussed with the use of additional capabilities of information technology. The multimedia application developed has been used in an academic environment; however, with some modifications, it could be used to improve the “learning curve” of new employees in a company environment.  相似文献   

6.
System simulation has proved to be an effective tool for planning and improving the performance of a construction process in many successful case studies. However, with the aid of a three dimensional (3D) visualization system, simulation technology will be engaged to its farthest-reaching potential. This paper presents a geographic information system (GIS)-based visual simulation method, in which system simulation techniques are integrated with visualization techniques. The GIS-based visual simulation system (GVSS) was developed by the authors. The GVSS is a simulation tool offering powerful planning, visualizing, and querying capabilities that facilitate the detection of logic errors in simulation models. The software also helps to understand the comprehensively complex modeled construction process, and is capable of organizing vast amounts of spatial and nonspatial data involved in simulation. A hydroelectric project, which will take place on the Yellow River in the northwest of China, is used as an example. An optimum equipment set scheme is determined by simulating a variety of scenarios taking place under different construction conditions. Likewise, other parameters, such as the construction sequence of dam blocks, the monthly intensity of the concrete process, and the construction appearance at the middle and end of each year, are obtained. Meanwhile, the complex processes of dam construction are demonstrated dynamically using 3D animation, which provides a powerful tool for quickly and comprehensively understanding the whole construction process. The GVSS has proven to be a helpful and useful tool for the design and management of concrete dams.  相似文献   

7.
A good site layout is vital to ensure the safety of the working environment and effective and efficient operations. Site layout planning has significant impacts on productivity, costs, and duration of construction. Construction site layout planning involves identifying, sizing, and positioning temporary and permanent facilities within the boundary of the construction site. Site layout planning can be viewed as a complex optimization problem. Although construction site layout planning is a critical process, systematical analysis of this problem is always difficult because of the existence of a vast number of trades and interrelated planning constraints. The problem has been solved using two distinct approaches: Optimization techniques and heuristics methods. Mathematical optimization procedures have been developed to produce optimal solutions, but they are only applicable for small-size problems. Artificial intelligent techniques have been used practically to handle real-life problems. On the other hand, heuristic methods have been used to produce good but not optimal solutions for large problems. In this paper, an optimization model has been developed for solving the site layout planning problem considering safety and environmental issues and actual distance between facilities. Genetic algorithms are used as an optimization bed for the developed model. In order to validate the performance of the developed model, a real-life construction project was tested. The obtained results proved that satisfactory solutions were obtained.  相似文献   

8.
Dynamic site layout planning requires identifying and updating the positions of all temporary construction facilities such as offices, storage areas, and workshops over the entire project duration. Existing models do not guarantee global optimal solutions because they focus on optimizing the planning and layout of successive construction stages in a chronological order, without considering the future implications of layout decisions made in early stages. This paper presents the development of an approximate dynamic programming model that is capable of searching for and identifying global optimal dynamic site layout plans. The model applies the concepts of approximate dynamic programming to estimate the future effects of layout decisions in early stages on future decisions in later stages. The model is developed in three main phases: (1) formulating the decision variables, geometric constraints, and objective function of the dynamic site layout planning problem; (2) modeling the problem using approximate dynamic programming; and (3) implementing and evaluating the performance of the model. An evaluation example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating global optimal solution for dynamic site layout planning of construction projects.  相似文献   

9.
Environmental sustainability has become one of the key drivers for continuous growth in the construction industry. Many project practitioners face challenging circumstances in finding an effective way to prevent pollution and minimize wastes by making the best use of the increasingly scarce natural resources. However, most of these efforts are focused on planning and/or design strategies; therefore, they fail to thoroughly cover the environmental issues based on the construction execution level. Further, there is a lack of quantitative measurement system and management-level guidance. To overcome these limitations, this paper proposes a new methodology that assists project managers to assess the performance level of a project in terms of waste management practice. This study is based on a two-pronged approach. One is the identification of the waste management influence factors that play an important role in decreasing waste and increasing recycled materials on construction sites. The other is the development of an assessment tool to measure the level of waste management performance for a particular project. As a result of this work, 59 factors were identified and an assessment tool was developed based on quantification of these factors. The tool has been proved to effectively measure waste management performance throughout four real-case validity tests. From the industry perspective, this paper contributes to establishing the environmentally sustainable production systems by providing the project stakeholders with an established set of influence factors and with a diagnosis tool for measuring their current performance. Additionally, project owners can use the output of the tool, especially the total index score, as a measure to benchmark the level of waste management for continuous improvement.  相似文献   

10.
为了保障多规格石高强度开采矿山的石料供需平衡和安全高效生产,利用三维数字矿山软件进行矿山开拓系统的规划设计与施工监管。以舟山绿色石化基地大、小鱼山岛多规格石高强度开采工程为背景,采用3Dmine软件建立了矿区的三维数字表面模型,并进行了运输道路优化设计、开拓工程量计算等,最后进行动画模拟,分析露天矿山开拓系统的车—路协同效果,确保满足工程施工强度要求。实践表明:生成的开拓系统设计可视性好,有助于采场合理布局和石料科学调配,为多规格石的高强度开采施工奠定了技术基础。利用3Dmine数字矿山软件,设计多规格石高强度开采矿山的三维开拓系统,并将其应用于现场施工,有助于保障多规格石的供需平衡调配和矿山持续高效的生产管理。  相似文献   

11.
李立 《铜业工程》2013,(3):38-40,68
通过对汇元锰业冶炼厂总图运输设计实例的分析,阐述了城市规划、生产工艺、外部运输条件、风向、建筑物朝向、近期建设、远期发展、厂区绿化等因素对厂区总体布置的影响,总结了锰冶炼厂总平面设计经验,可为类似企业设计提供借鉴。  相似文献   

12.
The case study method, which has been proven to be a very useful learning tool, can be further enhanced with the use of multimedia and the World Wide Web. This paper demonstrates multimedia and Web-based enhancement with the design and construction of a port, a large-scale civil engineering project. The main purpose was to create an educational tool that brings into the classroom a “real-life” design and construction problem, including the construction field, operation of equipment, and details of construction methods. This enables civil engineering students to better understand the details of the planning, design, and construction of a complicated project. Furthermore, through the use of evaluation tests, feedback on the students’ understanding of the case study can be provided to both the students and the educator. This application can be expanded beyond an academic environment for use as a learning tool in a business environment, which may be especially beneficial for new engineers.  相似文献   

13.
Traditional scheduling and progress control techniques such as bar charts and the critical path method (CPM) fail to provide information pertaining to the spatial aspects of a construction project. A system called PMS-GIS (Progress Monitoring System with Geographical Information Systems) was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. In PMS-GIS, the architectural design is executed using a computer-aided drafting (CAD) program (AutoCAD), the work schedule is generated using a project management software (P3), the design and schedule information (including percent complete information) are plugged into a GIS package (ArcViewGIS), and for every update, the system produces a CPM-generated bar chart alongside a 3D rendering of the project marked for progress. The GIS-based system developed in this study helps to effectively communicate the schedule∕progress information to the parties involved in the project, because they will be able to see in detail the spatial aspects of the project alongside the schedule.  相似文献   

14.
This study combines two luminous areas, geographical information systems (GIS) and E-commerce system, and applies the combined technology in the business of construction material trading. In the era of electronic business, trades can be accomplished without limitations on time and space. The statement is true in principle only, but in reality, any kind of business activity must involve transportation of goods from one place to another, and therefore, constrain in space is always in existence. GIS is capable to integrate, to manage, and to analyze information regarding to space (spatial information). This study investigates the roles of internet-based GIS in E-commence systems. It is identified that there is a great potential to use GIS in E-commerce system to provide better services in location-based queries, business area analysis, and transportation analysis. Accordingly, an E-commerce system for the business of construction material is developed. The implemented system is called construction materials exchange, this is currently operating for the over 2,000 buyers, 29,000 suppliers, and 1,000 agents, and the system mainly servers for the great China region. This paper presents the system from its conceptual business model, logical system design, to the system implementation.  相似文献   

15.
Current uses of computers in construction include design, planning, scheduling, and cost estimating. Much more could be achieved on a fully computer-integrated construction site. This paper describes initial work at the National Institute of Standards and Technology toward construction site integration and automation, beginning with a simple steel-erection procedure using an instrumented crane. CAD-generated geometry sets are transformed into a library of 3D construction site objects. These objects are then loaded into an augmented simulation system that tracks both equipment and resources based on real-time data from the construction site. With some future enhancements, the end result will be a world model of the site, in which as-built conditions can be assessed, current construction processes can be viewed as they occur, planned sequences of processes can be tested, and object information can be retrieved on demand. A project can be viewed and managed remotely using this tool. Remotely controlled construction in hazardous environments is a natural extension of this environment. The National Construction Automation Testbed (NCAT) is currently being used in various research projects with the intentions of making such possibilities a reality. A major effort in the NCAT is the development and testing of the metrology, communication, and simulation protocols required.  相似文献   

16.
Buffers have been commonly used as a production strategy to protect construction processes from the negative impact of variability. Construction practitioners and researchers have proposed several buffering approaches for different production situations and contexts. However, these solutions have been impractical for managing buffers. To overcome this, this study proposes a new site methodology for managing work-in-process (WIP) buffer in repetitive projects, on the basis of the reliable commitment model (RCM). RCM is a decision-making tool based on lean principles, which uses statistical models to develop more reliable work plans at the operational level. RCM helps to manage WIP buffer in work plans by using site information and planning reliability indicators that result in improved project performance, such as labor productivity and process progress. A repetitive building project was used as a case study. The main finding was that labor productivity, process progress, and waiting times improved when using larger WIP buffers than those typically used among crews. This shows the potential of RCM as a practical tool to manage WIP buffer sizes and to promote the use of lean production strategies at the operational level.  相似文献   

17.
EvoSite: Evolution-Based Model for Site Layout Planning   总被引:1,自引:0,他引:1  
Appropriate site layout of temporary facilities is crucial for enhancing the productivity and safety on construction sites. Site layout planning, however, is a complex problem, and researchers have attempted to solve it using a variety of optimization-based and heuristic-based techniques. In this paper, a genetic-algorithm-based model for site layout planning is presented. The advantages of the model stem from three main characteristics: (1) It applies to any user-defined site shape; (2) it accounts for the user preference in the relative closeness among the facilities; and (3) it incorporates a genetic algorithm procedure to search for the optimum layout in a manner that simulates natural evolution. Based on the proposed model, a comprehensive system for site layout planning (EvoSite) is developed. EvoSite uses an intuitive spreadsheet representation of the site and the facilities, and automates the evolution of layout solutions. Details of model development and implementation are described, and an example application is presented to demonstrate the capabilities of the EvoSite system. The advantages, limitations, and future extensions of EvoSite are then discussed.  相似文献   

18.
Commitment planning reliability at an operational level is a key factor for improving project performance. In the last 15 years, the Last Planner System, a production planning and control system based on lean production principles, has improved commitment planning reliability in the construction industry. However, many construction decision makers continue to rely on their experience and intuition when planning their commitments, which hinders their reliability. The reliable commitment model (RCM) is proposed to improve commitment planning reliability at the operational level by using statistical models. RCM is an operational decision-making tool based on lean principles that supports short-term forecasting commitment planning using common-site information such as workers, buffers, and plans. RCM was tested in several case studies, demonstrating its production forecasting capabilities and its ability to help increase commitment planning reliability and improve project performance. RCM also supports workload and labor capacity matching decisions. RCM has the potential of becoming a useful production decision-making tool.  相似文献   

19.
Site layout planning is a complicated issue because of the vast number of trades and interrelated planning constraints. To unfold its complexity, this paper aims to confine the study to a particularly defined area of construction: the structural concrete-frame construction stage of public housing projects. In this study, optimization of the tower crane and supply locations is targeted, as they are the major site facilities for high-rise building construction. A site layout genetic algorithm model is developed and a practical example is presented. The optimization results of the example are very promising and demonstrate the application value of the model.  相似文献   

20.
Dynamic Layout Planning Using a Hybrid Incremental Solution Method   总被引:1,自引:0,他引:1  
Efficiently using site space to accommodate resources throughout the duration of a construction project is a critical problem. It is termed the “dynamic layout planning” problem. Solving it involves creating a sequence of layouts that span the entire project duration, given resources, the timing of their presence on site, their changing demand for space over time, constraints on their location, and costs for their relocation. A dynamic layout construction procedure is presented here. Construction resources, represented as rectangles, are subjected to two-dimensional geometric constraints on relative locations. The objective is to allow site space to all resources so that no spatial conflicts arise, while keeping distance-based adjacency and relocation costs minimal. The solution is constructed stepwise for consecutive time frames. For each resource, selected heuristically one at a time, constraint satisfaction is used to compute sets of feasible positions. Subsequently, a linear program is solved to find the optimal position for each resource so as to minimize all costs. The resulting sequence of layouts is suboptimal in terms of the stated global objective, but the algorithm helps the layout planner explore better alternative solutions.  相似文献   