1.
<正>南水北调中线卢沟桥暗涵工程第二标段总长972 m,桩号为DY3+480~DY4+452。该标段除涵身段外另有排气阀井1对。暗涵横断面布置采用两孔钢筋混凝土箱涵形式,每孔箱涵内净空尺寸为宽3.8 m、高3.8 m,涵内四角处设倒角300 mm×300 mm。涵身每12 m设一变形缝。采取两孔一联共同设置一道橡胶止水带方案。缝内嵌聚乙烯低发泡闭孔泡沫塑料板。  相似文献   

2.
1概述龙滩水电站右岸导流洞长849.421m,城门洞型,成型断面16m×21m,最大水头80m,最大流速25m/s.导流洞混凝土衬砌包括:进口渐变段(ER0+000~ER0+21.5)、洞身段堵头段和一般洞身段三大部分组成,混凝土总方量74383m3,进口渐变段开挖最大断面宽24883mm×高26150mm,属特大型洞室,衬砌混凝土厚为2.5m.进口渐变段开挖与一次支护已完成:喷钢纤维混凝土C20厚150mm,常规锚杆:28@2400mm×1200mm,L=6000mm外露1000mm,梅花形布置和预应力锚杆:36@2400mm×1200mm,L=9000mm外露150mm,预应力200kN,梅花形布置,二种类型锚杆间隔布置.进口渐变段混凝…  相似文献   

3.
王刚  徐杰  鲍善军 《治淮》2012,(2):22-23
一、工程概况新沂市新港北路新戴河桥,桥梁设计荷载为汽-20,挂-100.桥面宽15m+2×1m.上部结构为3孔16m先张法预应力空心板梁,桥墩处采用桥面连续,下部结构为柱式墩台、桩基础.桩基为直径1200mm钻孔灌注桩,桥台桩长25m,桥墩桩长31m.预应力空心板梁共计48片.先张法空心板梁宽99cm,梁高70cm,板中空洞直径50cm,预应力混凝土设计标号为C40.设计预应力筋为φj12.70钢铰线,标准强度Rby=1860MPa,Ey=1.9×105MPa,松驰率为2.5%,截面积98.7mm2.每片中梁有16根钢铰线,每片边梁有18根钢铰线,布置在梁板底部呈直线分布.  相似文献   

4.
桑河二级水电站为典型的平原区宽河道、大流量河流枢纽,适宜采用明渠分期导流方式,导流布置较为灵活,且对枢纽格局、工程投资和建设工期有重大影响。根据工程特点,以节约工程投资为主要出发点,结合枢纽布置研究,采用了左岸岸坡明渠+河床泄洪设施和发电厂房的布置格局,导流明渠底宽160m,底板不衬砌;不设置导流底孔,明渠截流利用永久泄洪表孔泄流,截流天然落差7m,截流难度世界前列,根据研究创造性的采用了宽戗堤+拦石坎的截流方式,并取得了成功。桑河二级工程为平原河流大流量施工导流和高落差截流树立了典范。  相似文献   

5.
胡兆球  成银  孙业文 《治淮》2002,(2):13-14
石梁河水库扩大泄量工程主要建设内容包括新建由10×10.0m的泄洪闸和111.7m宽的泄槽、消力池等组成的溢洪道、赔建设计流量50m~3/s的灌溉涵洞和装机容量1200kW的水电站、原土坝局部改线、老闸下游北导水堤接长以及新建管理设施等,加之原水库的土坝、老泄洪闸和翻水泵站,工程项目多、功能齐全、涉及面广。其中工程地形变化较大、布置位置偏紧、多个建筑物相互交汇、地质条件相对复杂是本工程设计需要解决的主要问题。同时,为方便施工和运行管理,采用“四新”和提高操作自动化水平,又是工程设计需要研究的重要课题。通过分析研究、合理布置和设计创新,形成工程的主要设计特点如下。  相似文献   

6.
<正>一、概述某公路桥上层设计为双向六车道双幅预制小箱梁,跨径40.7m,单幅桥面宽15.5m,布置5片小箱梁,箱梁横向间距为3m。桥面设计5孔一联,先简支后连续。每片小箱梁底宽1米,中梁顶宽2.4米,边梁顶宽2.85米,梁体高度2.2米,设有3道横梁,横梁与横梁之间采用湿接头连接。每片小箱梁之间纵向现浇湿接缝宽60cm,横向现浇湿接头宽60cm。湿接头和湿接缝均采用C50微膨胀砼;小箱梁负弯矩预应力钢筋采用5Φ~S12.5mm钢绞线,锚具  相似文献   

7.
分析研究了引汉济渭秦岭隧洞TBM施工段长距离连续皮带机的布置、设备选型和支架性能,并对连续皮带机安装和运行过程中的问题及处理措施进行了阐述和介绍。为满足要求,TBM施工段岭南工程连续皮带机采用三托辊输送带,皮带机带宽914mm,厚度15 mm,带速2~3 m/s,采用ST2000钢丝皮带,皮带支架满足受力和稳定性要求,针对安装运行中存在的问题,采取了分渣器气动改液压、移动尾端改造等处理措施,取得了良好效果。  相似文献   

8.
正一、工程概况河庄站位于河景路与河庄大道十字路口,车站沿河景路东西向布置,车站规模535.16m×21.7m,设3组风亭、8个出入口。盖板长30.7m,宽21.7m,厚度800mm,混凝土强度等级C35P8,围护结构体系由10幅800mm厚45.173m长地连墙、18根直径1100mm长37.5m立柱桩、φ850@600三轴搅拌桩抽条+裙边加固、φ800@600高压旋喷桩加固构成。盖板下为3道内支撑,其中第1道为1000mm×900mmC30混凝土支撑,第2、3道采用φ800(t=16mm)钢支撑单拼。受交通疏解影响,盖板分两期施工,  相似文献   

9.
地下式MBR工艺在广州京溪污水处理厂的应用   总被引:2,自引:0,他引:2  
广州京溪污水处理厂工程设计规模10万m3/d,污水处理采用MBR工艺。污水处理厂土建布置采用地下式组团布置形式,主要处理构筑物设于地下,地上用作绿化景观。介绍了污水处理厂的工艺流程、主要构筑物设计情况,并对主要设计特点和新技术的应用进行分析。  相似文献   

10.
《治淮》2020,(7)
正一、引言花园湖退洪闸由闸室、两岸连接建筑物、防渗排水设施、上游铺盖、下游消力池及上下游导流堤等建筑物组成。退洪闸闸室采用钢筋混凝土开敞式结构,共27孔,单孔净宽12.00m,总净宽324.0m。闸室顶部布置公路桥和工作桥,公路桥布置在闸室上游侧,桥面总宽9m,工作桥桥顶高程31.3m,上设启闭机房,宽5.60m(6.2m),房内布置27台启  相似文献   

11.
通过利用岩土工程仿真计算分析软件GeoStudi02007,对新疆某水利枢纽上游围堰工程进行二维平面渗流分析计算。计算结果表明:当防渗墙深度由17m增加至20m时,围堰渗流量相应减小2.28%;当防渗墙深度由20m增加至25m时,围堰渗流量相应减小4.64%,增加防渗墙深度,对减小围堰渗流量的作用不大;当防渗墙深度为17m时,围堰总渗流量2.836m3/s。围堰下游出逸点附近比降在0.115~0.142范围内。分析计算成果可为围堰的防渗结构优化设计提供参考。  相似文献   

12.
The Egyptian Ministry of Water Resources and Irrigation (MWRI) has expressed concern about the current high cost of the Irrigation Improvement Project (IIP) implemented in the “old lands” of the lower reaches of the Nile River. Because the IIP is financed through fees paid by the direct beneficiaries of the project, i.e., irrigation water users, these same Egyptian agricultural producers are especially sensitive to the higher than expected costs that the project has incurred to date. The objective of the current study is to evaluate whether this cost reduction is associated with any deficiency in irrigation performance. This Monitoring and Evaluation (M&;E) study aims to answer questions such as: Does reducing pump capacity and increased pump operation affect the farmers negatively? And, does the use of electricity instead of diesel fuel affect the farmers positively? Six indicators were used to compare new design criteria in the W10 and the IIP1 irrigation system designs, water savings, irrigation cost, irrigation time, night irrigation, and land savings. The W10 project design achieved the minimum actual operating cost per unit of area and per unit of water compared to the IIP1 project design on both Meet Yazied and El-Mesk Canals. The total cost per unit of area in the W10 project design is lower than IIP1 by 19.33% and 24.92% on the Meet Yazied and El-Mesk Canals, respectively. The total cost per unit of water in the W10 design is also lower than IIP1 on the Meet Yazied and El-Mesk Canals. Average irrigation time for rice and cotton crops cultivated in the W10 area are higher than average irrigation time for these crops cultivated in the IIP1 area for all locations on the Mesqa (head, middle and tail), because of increased pump operation in the W10 area (16 to 20 h d???1). The number of irrigation events at the head of the Sefsafa Canal in the W10 area is higher than on the Meet Yazied and El-Mesk Canals in the IIP1 areas because of the increased pump operation in the W10 area.  相似文献   

13.
人民胜利渠灌区渠井结合节水灌溉的斗渠、农渠全部采用了混凝土U形渠道,田间灌水工程中推广短畦窄垄,达到了节水的目的.渠井结合工程布局方案包括机井合理密度、渠井位置、田面工程规格、配套排水工程布设等.以翟坡镇灌溉区为典型,进行了渠井结合工程的效益分析:666.7 hm2耕地工程建设需要投资105.64万元,每年可创经济效益74.14万元,还本年限为1.76 a,经济效益显著;渠井结合节水灌溉的田间工程措施还可调控地下水位,提高水的利用率,社会效益显著.  相似文献   

14.
介绍了大同县下高庄膜下滴灌工程项目概况、建设的必要性、工程中基本参数的选取、工程设计,通过实施膜下滴灌工程,提高了水资源的利用率,为农民增产增收提供了有力保障。  相似文献   

15.
根据河北平原三河井灌区节水灌溉工程推广应用的实践,提出了一种可称之为“支管退行式畦灌”的节水地面灌溉形式。这种灌溉形式属于畦灌,但可适用于畦长超过75m的长畦,畦长最长可达到200m以上,而且对地面平整度要求不高,同时又具有小畦灌的节水效果,在实现均匀灌水的情况下,可以达到750m3/hm2的灌水定额。  相似文献   

16.
为贯彻落实党中央、国务院关于大力发展节水灌溉的决策部署,科学推进全国规模化节水灌溉增效示范项目建设,水利部在全国选取了多个规模化节水灌溉增效示范点,徐闻县是广东省的试点县之一。该文在徐闻县农业灌溉现状的基础上,论述了该工程的灌溉水源、节水灌溉型式、灌溉工程设计与布置等关键技术方案,并分析了工程项目投资与预期效益,对徐闻县规模化节水灌溉增效示范项目的后续建设具有指导意义,同时也为广东省及其他类似地区的推广应用提供了经验借鉴。  相似文献   

17.
开展多孔介质中悬浮颗粒的迁移-脱离过程研究对地下水回灌工程、注浆工程和石油工程等具有重要意义。以地下水源热泵工程为依托,提出了描述颗粒迁移-脱离过程的波浪状曲面模型,研究不同的粒径组合以及不同压力对多孔介质中颗粒迁移以及脱离特性的影响。在此基础上,采用Comsol对典型地下水源热泵工程进行模拟,揭示了不同粒径及压力分布条件下回灌堵塞区分布规律。结果表明:在相同颗粒粒径组合(相同临界速度)下,压力越大,可以脱离的悬浮颗粒的范围越大;在相同压力下,临界速度越大,可以脱离的悬浮颗粒的范围越小;其他条件相同时,位置离抽水井和回灌水井越近,压力越大,渗流速度越大,悬浮颗粒越容易脱离。  相似文献   

18.
黄冰强 《江淮水利科技》2022,17(2):16-19,30
泵站工程在结构计算时,空间三维有限元软件相比常规方法更能反应工程的实际工作状况,本文以和县金河口排灌站工程为例,采用 MARC 有限元软件建立三维结构模型,进行应力、位移研究分析,结果表明该泵房大部分构件的结构强度不满足规范要求,亟待除险加固。  相似文献   

19.
乐北联圩东湖电排站扩建工程原设计为常规轴流泵 介绍了在技施设计中 ,结合该工程的地形地质、施工环境、施工工期、城市景观等方面因素 ,并进行全面分析 ,选用了大型潜水电泵 ,达到预期的功效  相似文献   

20.
杨凌示范区某段热网工程顶管施工中遇到流沙,采取双井互扰抽水技术迅速降低水位,利用计算机仿真技术寻找最佳水位线,加快工程进度,确保示范区道路交通安全和热网工程的正常运行。  相似文献   