首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到10条相似文献,搜索用时 109 毫秒
1.
The European “Floods Directive” 2007/60/EC (FD) asks Member States to develop flood risk maps on the bases of most appropriate and advanced tools, with particular attention on limiting required economic efforts. The question arises on how these tools should be selected so as to supply all the knowledge that is required to develop Flood Risk Management Plans (FRMPs). By analysing the implementation of the FD in the Po River Basin (Italy), the paper describes and compares two different approaches for flood risk assessment: the expert driven-qualitative approach vs. the quantitative approach based on damage models. The comparison shows, as expected, that quantitative approaches supply more useful knowledge for the development of FRMPs (and for flood risk management in general) with respect to qualitative approaches. However, they still present limits which prevent their adoption without critically consider the peculiarities of the investigated area in terms of available knowledge on hazard, exposure and vulnerability. Accordingly, considerations are supplied on how effectiveness of quantitative approaches can be maximized, towards flood risk management objectives.  相似文献   

2.
Floods are a common feature in rapidly urbanizing Dhaka and its adjoining areas. Though Greater Dhaka experiences flood almost in every year, flood management policies are mostly based on structural options including flood walls, dykes, embankments etc. Many shortcomings of the existing flood management systems are reported in numerous literatures. The objective of this paper is to assess flood hazard in Greater Dhaka for the historical flood event of 1998 using Synthetic Aperture Radar (SAR) data with GIS data. Flood-affected frequency and flood depth calculated from the multi-date SAR imageries were used as hydrologic parameters. Elevation heights, land cover classification, geomorphic division and drainage network data generated from optical remote sensing and analogue maps were used through GIS approach. Using a ranking matrix in three dimensional multiplication mode, flood hazard was assessed. All possible combination of flood hazard maps was prepared using land-cover, geomorphology and elevation heights for flood-affected frequency and floodwater depth. Using two hazard maps which produced the highest congruence for flood frequency and flood depth, a new flood hazard map was developed by considering the interactive effect of flood-affected frequency and floodwater depth, simultaneously. This new hazard map can provide more safety for flood countermeasures because pixels belonging to higher hazard degrees were increased due to the consideration of higher degrees of ranks. The estimation of flood hazard areas revealed that a major portion of Greater Dhaka comprised moderate to very high hazard zone. Only a little portion (8.04%) was found to be the least vulnerable to potential flood hazard. Conversely, 28.70% of Greater Dhaka was found within very high hazard zone. Based on this study, comprehensive flood hazard management strategies for land use planning decision were proposed for the efficient management of future flood disasters.  相似文献   

3.
Flood Risk Management in Flanders: Past Developments and Future Challenges   总被引:1,自引:1,他引:0  
This paper presents the state of the art of flood risk management in Flanders, a low-lying region in the northern part of Belgium which is vulnerable to flooding. Possible flood hazard sources are not only the many rivers which pass through the Flemish inland, but also the North Sea, which is sensitive to the predicted sea level rise and which can affect large parts of the Flemish coastal area. Due to the expected increase in flood risks in the 21st century, the Flemish government has changed its flood management strategy from a flood control approach to a risk-based approach. Instead of focusing on protection against a certain water level, the objective now is to assure protection against the consequences of a flood, while considering its probability. In the first part, attention is given to the reasoning and functioning of the risk-based approach. Recent improvements to the approach are discussed, as well as the GIS-implementation of the entire model. The functioning of the approach is subsequently demonstrated in two case studies. The second part of the paper discusses future challenges for the flood risk management in Flanders. The driving force behind these challenges is the European Directive on the assessment and management of flood risks, which entered into force in 2007. The Flemish implementation of the directive is discussed and situated in the European landscape. Finally, attention is given to the communication of flood risks to the general public, since the “availability” of flood risk management plans is among the requirements of the EU Floods Directive.  相似文献   

4.
中国洪水灾害危险程度区划   总被引:51,自引:4,他引:51  
张行南  罗健  陈雷  李红 《水利学报》2000,31(3):0001-0008
洪灾的含义包括洪水和灾害两个方面。本文从气象、径流和地形三因素考虑,采用成因分析的方法,制成了洪水危险程度区划图。以耕地和人口为经济因素指标,考虑洪水造成的灾害,制作成洪灾危险程度区划图。本文制作的区划图是客观的,已得到了一些领域专家的认可,可以作为防洪规划等宏观决策的依据。  相似文献   

5.
关于我国洪水风险图编制工作的思考   总被引:2,自引:0,他引:2  
向立云 《中国水利》2005,(17):14-16
我国第一张洪水风险图是1984年绘制完成的,到现在,无论是在洪水风险理论、洪水风险分析方法和模型、洪水风险特征展示和绘制技术,还是在洪水风险图编制规范的制订等方面都有了长足的进步,并运用二维非恒定流的洪水分析模型陆续研究绘制了部分城市、蓄滞洪区、洪泛区和防洪保护区约10万km2的洪水风险图,形成了具有较高水平的洪水风险图技术体系和一定规模的人才队伍,一些洪水风险图成果已开始运用于实际防洪工作之中.今后还应进一步明确洪水风险图的使用对象和用途,落实洪水风险图制作的行政管理机制、编制计划和经费投入,构建若干官方认可的规范化的风险分析和风险图制作平台,不断弥补基础信息的不足.  相似文献   

6.
洪水风险评估包括洪峰、洪量、水位和洪水过程.从安全角度来看,洪水风险评估对于水电工程、防洪工程的设计和运行是十分重要的.洪水管理旨在最大限度地减少洪泛区的洪灾损失,因此根据洪水发生的量级和频率进行洪水风险评估、制作洪水风险图对于洪水管理至关重要.目前在印度采取的主要防洪措施有:进行堤坝溃决风险分析、发布洪水预警、制作洪水风险图或洪灾风险图等.根据洪灾风险评估确定不同的保险费用,并据此推行防洪保险计划,可能非常有助于洪泛区的区划工作.地形等高线图是进行洪泛区区划的前提条件.根据这些图集和洪水风险评估,洪泛区能够按照区划进行开发活动的分类管理.  相似文献   

7.
从洪水风险图发展历程看,欧洲与我国比较相似,洪水风险图的起步时间比较接近,目前也都处在一个大的发展阶段.本文从洪水风险图的发展背景、洪水风险图的种类、洪水分析计算方法、洪水风险图的制作单位和运用方式等多个方面阐述了欧洲的主要做法,对比了与我国洪水风险图编制工作的异同.为进一步适应我国洪水风险管理工作的需要,建议我国尽早开展洪水危险等级划分标准的研究以及包含风险信息的洪水风险图绘制工作,规范参与洪水风险图绘制的洪水分析计算工具,进一步明确洪水风险图的角色和使用方法等问题.  相似文献   

8.
防洪减灾风险管理研究综述   总被引:4,自引:0,他引:4       下载免费PDF全文
主要对水文风险、水力风险、经济风险、风险决策和洪水保险五个方面的风险管理方法在防洪减灾中的研究现状进行归纳和评述 .其中水文风险的研究重点分为线型选择、参数估计、风险率计算三部分 ;水力风险的研究主要集中在水库泄洪风险及河道或洪泛区的洪水演进研究 ;经济风险分析主要集中在防洪费用效益的风险分析 ;风险决策研究通常表现为防洪问题的可靠性规划和多目标风险分析两种形式 ;洪水保险的研究主要是利用模拟模型来推导一个最优洪水保险策略 .文末阐述了防洪减灾风险管理的发展趋势  相似文献   

9.
我国推进洪水风险图编制工作基本思路的探讨   总被引:1,自引:0,他引:1  
程晓陶 《中国水利》2005,(17):11-13,37
编制洪水风险图是推进洪水风险管理的一项重要的基础工作,也是一项技术性、政策性很强的工作."十一五"期间我国将大力加强洪水风险图的编制工作,为此迫切需要理清思路,明确怎么做.在总结近几十年国内外风险图制作经验教训的基础上,提出今后我国的洪水风险图编制工作应坚持分三步走,加强前期基础研究,并明确洪水风险图的法律地位.  相似文献   

10.
洪水风险分析是防洪非工程措施的重要组成部分,而洪水危险性评价是风险分析的基础。现有的洪水危险性评价方法由于需要获得淹没水深,在对洪水风险预测时要求复杂的水力学模型和高分辨率数据的支撑,但业务化过程中常常无法满足数据要求,为了简化洪水危险性评价的过程,确保评价结果的准确性,提出了一个新的简单且综合的洪水危险性评价指标(FHI,Flood Hazard Index)。该指标以GisNet和ArcGIS为软件平台,结合分布式水文模型,依据洪灾的形成机理,综合考虑分布式流量与地形指数。结合北京山区红螺谷流域的具体情况,对新指标进行了对比检验。结果显示,FHI能够真实地反映区域洪灾随空间变化的趋势,为未来洪水危险性评价与预测的研究,提供了一个全新的思路,对洪水风险研究体系的完善具有重要的现实意义。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号