首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到10条相似文献,搜索用时 234 毫秒
1.
In a car, there are approximately 30,000 parts produced by many different industries. This is due to the complexity and enormity of the automotive industry chain. The vehicle assembly process comprises welding, painting, prefabrication, and final entire-vehicle assembly. The assembly line has the largest labor force, which should be arranged and balanced to increase production efficiency and reduce labor force requirements. Unlike traditional studies on assembly line balancing problems (ALBPs), this study considers the characteristics of the automotive industry, such as multi-manned workstations, minimization in terms of the numbers of operators and workstations for streamlined production, budget constraints, the optimization of both task and operator allocation among workstations, and the determination of the start/end processing time of each task at different workstations. To address these NP-hard problems, a hybrid heuristic approach that combines the procedure of building feasible balancing solutions and the simulated annealing algorithm is proposed to map out an optimal line balancing plan for multi-manned workstations and to reduce the required workspace for shop operations. Based on the design and analysis of experiments, the effects of the maximum number of allowed operators per workstation and those of the cycle time on ALBP solutions are explored. The optimal combination of algorithm parameters is also determined. The results of this study can serve as a practical reference in planning the allocation of tasks, workstations, and operators in the industry.  相似文献   

2.
Assembly line balancing is the problem of assigning tasks to workstations by optimizing a performance measure while satisfying precedence relations between tasks and cycle time restrictions. Many exact, heuristic and metaheuristic approaches have been proposed for solving simple straight and U-shaped assembly line balancing problems. In this study, a relatively new optimization algorithm, Bacterial Foraging Optimization Algorithm (BFOA), based heuristic approach is proposed for solving simple straight and U-shaped assembly line balancing problems. The performance of the proposed algorithm is evaluated using a well-known data set taken from the literature in which the number of tasks varies between 7 and 111, and results are also compared with both an ant-colony-optimization-based heuristic approach and a genetic-algorithm-based heuristic approach. The proposed algorithm provided optimal solutions for 123 out of 128 (96.1 %) test problems in seconds and is proven to be promising.  相似文献   

3.
This paper considers two-sided (left- and right-side) assembly lines that are often used in assembling large-sized products, such as trucks and buses. A large number of exact algorithms and heuristics have been proposed to balance one-sided assembly lines. However, little attention has been paid to balancing the two-sided lines. An efficient assignment procedure is developed for two-sided assembly line balancing problems. A special emphasis is placed on maximizing work relatedness and maximizing work slackness, which are of practical significance especially in two-sided lines. We first investigate the characteristics of two-sided lines and define new measures for the balancing. Then, a group assignment procedure, which assigns a group of tasks at a time rather than a unit task, is designed. Experiments are carried out to demonstrate the performance of the proposed method. The results show that our procedure is promising in the solution quality.  相似文献   

4.
This paper is the first one of the two papers entitled “modeling and solving mixed-model assembly line balancing problem with setups”, which has the aim of developing the mathematical programming formulation of the problem and solving it with a hybrid meta-heuristic approach. In this current part, a mixed-integer linear mathematical programming (MILP) model for mixed-model assembly line balancing problem with setups is developed. The proposed MILP model considers some particular features of the real world problems such as parallel workstations, zoning constraints, and sequence dependent setup times between tasks, which is an actual framework in assembly line balancing problems. The main endeavor of Part-I is to formulate the sequence dependent setup times between tasks in type-I mixed-model assembly line balancing problem. The proposed model considers the setups between the tasks of the same model and the setups because of the model switches in any workstation. The capability of our MILP is tested through a set of computational experiments. Part-II tackles the problem with a multiple colony hybrid bees algorithm. A set of computational experiments is also carried out for the proposed approach in Part-II.  相似文献   

5.
Avoiding work overload (imbalance) in mixed model U-line production systems entails an investigation into both balancing and sequencing problems at the same time and that is why some authors have considered both planning problems simultaneously. However because of the existing differences between planning horizons of balancing and sequencing problems (the former is a long to mid-term planning problem whereas the latter has a short term planning horizon) this simultaneous approach is only practical under very special conditions. It is also known that installation of an assembly line usually needs considerable capital investments and consequently it is necessary to design and balance such a system so that it works as efficiently as possible. To do so, in this paper, we develop a new approach to balance a mixed model U-shaped production system independent of what product sequences may be. This new approach is based on minimization of crossover workstations. Due to utilization of crossover workstations, balancing mixed model assembly lines in U-shaped line layouts is more complicated than that of straight lines. Some kind of issues including the ‘model mixes’ appearing in such workstations and the time taken for an operator to move from one side of the line to another increase the complexity of mixed model U-line balancing problems (MMULBP). Therefore it seems reasonable to develop a model in which minimizing the number of crossover workstations and maximizing the line efficiency are considered at the same time. Such a model is presented in this paper. In the proposed model, minimizing the variation of workload is also considered and taking into account operator's travel times, an extra time is assigned to workload of crossover workstations. Furthermore a genetic algorithm (GA) is proposed and a number of well-known test problems are solved by the GA and the related results are illustrated. Finally, the conclusion is presented.  相似文献   

6.
Assembly line balancing problems with multi-manned workstations usually occur in plants producing high volume products (e.g. automotive industry) in which the size of the product is reasonably large to utilize the multi-manned assembly line configuration. In these kinds of assembly lines, usually there are multi-manned workstations where a group of workers simultaneously performs different operations on the same individual product. However, owing to the high computational complexity, it is quite difficult to achieve an optimal solution to the balancing problem of multi-manned assembly lines with traditional optimization approaches. In this study, a simulated annealing heuristic is proposed for solving assembly line balancing problems with multi-manned workstations. The line efficiency, line length and the smoothness index are considered as the performance criteria. The proposed algorithm is illustrated with a numerical example problem, and its performance is tested on a set of test problems taken from literature. The performance of the proposed algorithm is compared to the existing approaches. Results show that the proposed algorithm performs well.  相似文献   

7.
In the event that big-sized complex products (containing a large number of assembly tasks most of which have long task times) are produced in simple or two-sided assembly lines, hundreds of stations are essentially required. Long product flow time, a large area for establishment of the line, a high budget for the investment of equipment, and tools in stations and several work-in-process are also required for these kinds of products. In order to avoid these disadvantages, assembly lines with parallel multi-manned workstations can be utilized. In this paper, these lines and one of their balancing problems are addressed, and a branch and bound algorithm is proposed. The algorithm is composed of a branching scheme, some efficient dominance and feasibility criteria based on a problem-specific knowledge. A heuristic-based guidance for enumeration process is included as an efficient component of the algorithm as well. VWSolver algorithm proposed for a special version of the problem in the literature has been modified and compared with the proposed algorithm. Results show that proposed algorithm outperforms VWSolver in terms of both CPU times and quality of feasible solutions found.  相似文献   

8.
Two-sided assembly lines are a special type of assembly lines in which workers perform assembly tasks in both sides of the line. This type of lines is of crucial importance, especially in the assembly of large-sized products, like automobiles, buses or trucks, in which some tasks must be performed at a specific side of the product. This paper presents an approach to address the two-sided mixed-model assembly line balancing problem. First, a mathematical programming model is presented to formally describe the problem. Then, an ant colony optimisation algorithm is proposed to solve the problem. In the proposed procedure two ants ‘work’ simultaneously, one at each side of the line, to build a balancing solution which verifies the precedence, zoning, capacity, side and synchronism constraints of the assembly process. The main goal is to minimise the number of workstations of the line, but additional goals are also envisaged. The proposed procedure is illustrated with a numerical example and results of a computational experience that exhibit its superior performance are presented.  相似文献   

9.
This paper addresses the problem of balancing assembly or fabrication lines. In order to achieve a given production rate or to optimize the use of workstations, one has to tackle the problem of balancing the production lines. It is well known that this problem belongs to the class of NP-hard problems. In this paper the polyhedron of the feasible solutions of the assembly line balancing problem is first studied. Then a Lagrangian relaxation algorithm that incorporates the set of cycle constraints in the objective function is proposed. These constraints are the complicating restrictions in the model. The relaxed problem has the interesting property that its linear programming relaxation always has integer optimal solutions. The subgradient algorithm is then used to maximize the Lagrangian dual. A heuristic is also used to find primal feasible solutions for the original line balancing integer program. These two bounds are then used to reduce the size of the branch-and-bound tree.  相似文献   

10.
In this paper, we examine an assembly line balancing problem that differs from the conventional one in the sense that there are multi-manned workstations, where workers’ groups simultaneously perform different assembly works on the same product and workstation. This situation requires that the product is of sufficient size, as for example in the automotive industry, so that the workers do not block each other during the assembly work. The proposed approach here results in shorter physical line length and production space utilization improvement, because the same number of workers can be allocated to fewer workstations. Moreover, the total effectiveness of the assembly line, in terms of idle time and production output rate, remains the same. A heuristic assembly line balancing procedure is thus developed and illustrated. Finally, experimental results of a real-life automobile assembly plant case and well-known problems from the literature indicate the effectiveness and applicability of the proposed approach in practice.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号