排序方式: 共有5条查询结果,搜索用时 0 毫秒
1
1.
The nuclear wastes in our country containa certain amount of SO_4~- ions. Therefore, once the nuclear wastes are processed with the solidification of borosilicate glass, a yellow separated phase called yellow phase often appears,which is very soluble to water. The authors suggest two methods to solve the problem. One is to wrap up the yellow phase in the basic glass so that it will not appear on the surface of the glass. The other is to eliminate the SO_4~- ions by reduction method, thus to do away with the yellow phase. Both methods work well to the aim. The present paper has provided some useful data and information to the practical problem of solidification of nuclear wastes in our country. 相似文献
2.
3.
电力系统风险因素是引起备用的主要原因,实现备用费用在各风险责任方之间公平合理地分摊是推进电力市场改革的重要一步。将备用容量和备用电量区分开来,通过类比条件风险价值的方法,建立了基于条件风险备用的容量费用分摊模型。该模型考虑了风险因素概率分布偏度对备用的影响;基于谁引发谁承担原则,建立了电量费用分析模型。利用以上模型可以科学地实现正负备用费用的分摊。最后,采用修改IEEE30节点进行仿真分析,验证了该分摊模型的有效性。 相似文献
4.
考虑峰谷分时电价影响的变电站容量规划方法 总被引:2,自引:0,他引:2
针对峰谷分时电价的实施会调整电力负荷进而影响电网规划的问题,提出了考虑峰谷分时电价影响的电网规划方案制定方法,并且建立了基于需求侧管理各参与方成本效益分析的峰谷分时电价模型及变电站容量规划模型。在峰谷电价比恒定的情况下,根据峰谷分时电价模型的计算结果选取算例地区峰谷分时电价的最优拉开比。在此基础上,对传统变电站容量规划方案和考虑峰谷分时电价影响的修正方案进行对比,最终得出:考虑峰谷分时电价影响的变电站容量规划方案在新建变电站容量减少的条件下,仍能满足地区电力平衡。并且该方案还能保证需求侧管理的各参与方均能获得更多利润,在有效节省建设投资的同时降低电力用户用电成本,明显提升电网规划的经济性和合理性。 相似文献
5.
1