排序方式: 共有5条查询结果,搜索用时 15 毫秒
1
1.
The building process and technical equipment of aviation radial tire were introduced,and the key points of building process control were investigated.T+2 building machine layout method was adopted in two-stage integrated building technology of aviation radial tire.The first stage building process included first stage inner liner lamination,first stage cord cylinder(turn-up plies) lamination,first stage cord cylinder(turn-in plies) lamination and die rubber lamination,and the second stage bulding process included belt spiral winding,corrugated protective layer lamination,tread lamination and drum shaping.The technical equipment of aviation radial tire is developing in the direction of specialization and differentiation. 相似文献
2.
3.
4.
本次开展探矿工作发现了独龙包钼矿,工作中注重收集成矿作用方面的资料。现根据大量的野外一手资料,运用自己逐渐摸索、总结的一套行之有效的思路、方法,即:确定蚀变类型与序次、据蚀变研究构造、重建构造-热液活动及蚀变-矿化过程,划分了7种热液蚀变类型、8次构造活动,其中包括2次热液成矿、矿后经历了1次扭性断裂构造活动,重现了成矿作用过程。此法实用、效果好,我们已用于多个勘查、考察项目工作中。对解决国内、外热液金属矿勘查项目有关构造-热液活动,蚀变-矿化方面的问题,乃至进一步的研究工作,提高工作质量、取得好的找矿效果,具有实际意义。 相似文献
5.
1