The problem of operating freeze drying of pharmaceutical products in vials placed in trays of a freeze dryer to remove free water (in frozen state) at a minimum time was formulated as an optimal control problem. Two different types of freeze dryer designs were considered. In type I freeze dryer design, upper and lower plate temperatures were controlled together, while in type II freeze dryer design, upper and lower plate temperatures were controlled independently. The heat input to the material being dried and the drying chamber pressure were considered as control variables. Constraints were placed on the system state variables by the melting and scorch temperatures during primary drying stage. Necessary conditions of optimality for the primary drying stage of freeze drying process in vials are derived and presented. Furthermore, an approach for constructing the optimal control policies that would minimize the drying time for the primary drying stage was given. In order to analyze optimal control policy for the primary drying stage of the freeze-drying process in vials, a rigorous multi-dimensional unsteady state mathematical model was used. The theoretical approach presented in this work was applied in the freeze drying of skim milk. Significant reductions in the drying times of primary drying stage of freeze drying process in vials were obtained, as compared to the drying times obtained from conventional operational policies. 相似文献
Work system improvements are implemented in various manufacturing processes to prevent problems caused by human errors. However, they are almost always applied to problems which have already occurred. This paper examines a method of identifying latent human errors existing within the work systems beforehand. A procedure for applying failure mode and effect analysis to this identification problem was defined based on over 1000 empirical errors: a work system decomposition criterion and fundamental error modes for listing latent human errors, and then applied to three practical manufacturing processes in order to evaluate its effectiveness. 相似文献
A CEC-funded project has been performed to tackle the problem of producing an advanced Life Monitoring System (LMS) which would calculate the creep and fatigue damage experienced by high temperature pipework components. Four areas were identified where existing Life Monitoring System technology could be improved:
1. 1. the inclusion of creep relaxation
2. 2. the inclusion of external loads on components
3. 3. a more accurate method of calculating thermal stresses due to temperature transients
4. 4. the inclusion of high cycle fatigue terms.
The creep relaxation problem was solved using stress reduction factors in an analytical in-elastic stress calculation. The stress reduction factors were produced for a number of common geometries and materials by means of non-linear finite element analysis. External loads were catered for by producing influence coefficients from in-elastic analysis of the particular piping system and using them to calculate bending moments at critical positions on the pipework from load and displacement measurements made at the convenient points at the pipework. The thermal stress problem was solved by producing a completely new solution based on Green's Function and Fast Fourier transforms. This allowed the thermal stress in a complex component to be calculated from simple non-intrusive thermocouple measurements made on the outside of the component. The high-cycle fatigue problem was dealt with precalculating the fatigue damage associated with standard transients and adding this damage to cumulative total when a transient occurred.
The site testing provided good practical experience and showed up problems which would not otherwise have been detected. 相似文献
The requirements on an object-oriented DBMS for management of information in a large, complex enterprise are presented. These requirements aid in the achievement of an environment characterized by data sharing, open architectures, application and data portability, and assurance of data integrity. They were defined from the point of view of a user of the DBMS; therefore they describe the expected functionality of the DBMS and do not specify the method of implementation to achieve this functionality. They encompass requirements on the data model, query and data manipulation languages, the system architecure, interfaces to the system, change management, and transaction management. 相似文献
Roasting coffee led to a drop in the ochratoxin A (OTA) concentration, as measured by the reference method, especially for dark type roasts. The way the beverage was prepared also affected the OTA content, which could paradoxically be higher than that of the initial roasted coffee. Assays on the thermal stability of pure OTA showed that it ought to be found in larger quantities in roasted coffee. This suggested that OTA was masked by reactions with the substrate during roasting. The absence of OTA in green coffee is therefore the best guarantee of safety. 相似文献
An alternative approach to understanding innovation is made using two intersecting ideas. The first is that successful innovation requires consideration of the social and organizational contexts in which it is located. The complex context of construction work is characterized by inter-organizational collaboration, a project-based approach and power distributed amongst collaborating organizations. The second is that innovations can be divided into two modes: 'bounded', where the implications of innovation are restricted within a single, coherent sphere of influence, and 'unbounded', where the effects of implementation spill over beyond this. Bounded innovations are adequately explained within the construction literature. However, less discussed are unbounded innovations, where many firms' collaboration is required for successful implementation, even though many innovations can be considered unbounded within construction's inter-organizational context. It is argued that unbounded innovations require an approach to understand and facilitate the interactions both within a range of actors and between the actors and technological artefacts. The insights from a sociology of technology approach can be applied to the multiplicity of negotiations and alignments that constitute the implementation of unbounded innovation. The utility of concepts from the sociology of technology, including 'system building' and 'heterogeneous engineering', is demonstrated by applying them to an empirical study of an unbounded innovation on a major construction project (the new terminal at Heathrow Airport, London, UK). This study suggests that 'system building' contains outcomes that are not only transformations of practices, processes and systems, but also the potential transformation of technologies themselves. 相似文献
Meeting time and cost objectives in complex projects involves specific problems and risks. An attempt is made to analyse the components of total cost increase of a project caused by time delay. An outline is given as to how these considerations can be used to estimate cost increases in investors' decision situations as well as to ascertain fair contractual penalties and claims for compensation and for the evaluation of justified project acceleration costs. 相似文献