首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   5篇
  免费   0篇
水利工程   1篇
冶金工业   4篇
  2020年   1篇
  2013年   1篇
  2003年   1篇
  2001年   1篇
  1999年   1篇
排序方式: 共有5条查询结果,搜索用时 0 毫秒
1
1.
Metallurgical and Materials Transactions A - Hybrid nanocomposites have potential as wear-resistant materials. However, synthesizing these nanocomposites by conventional molten state methods result...  相似文献   
2.
3.
Multiple Linear Correlation Analysis of Daily Reference Evapotranspiration   总被引:3,自引:3,他引:0  
An accurate estimation of reference evapotranspiration (ET0) is of paramount importance for many studies such as hydrologic water balance, irrigation system design and management, crop yield simulation, and water resources planning and management. Simple regression techniques, may sometimes, provide adequate estimation of ET0. Implementation of regression methods considering all the predictor variables may, however, lead to overfit and consequent reduction in the predictive capability. The regression models for ET0 have been developed in the present study for Tirupati, Nellore, Rajahmundry, Anakapalli and Rajendranagar regions of Andhra Pradesh, India by following step-wise procedure, eliminating superfluous predictor variables based on statistical criteria. The sunshine hours, wind velocity, temperature and relative humidity influenced ET0 in the study area. The linear regression models developed in terms of predictor variables may conveniently be applied in the regions selected for the present study and, in the regions with similar climatic conditions for satisfactory ET0 estimation.  相似文献   
4.
Local scour at circular piers founded on clay was studied experimentally in the laboratory to compare the depth of scour in sand and in clay and to investigate the effects of the Reynolds number, Froude number, and approach flow depth on scour depth. The depths of scour in front, at the side, and in the back of the piers were measured as a function of time under steady, gradually varied flow conditions. The measured scour-depth-versus-time curves were fitted with a hyperbola to estimate the equilibrium scour depths. The extrapolated equilibrium scour depths were compared with values predicted by the Federal Highway Administration equation. The results showed that although the rates of scour were much slower in clay than in sand, equilibrium scour in clay was about the same as in sand. It was found that the shape of the scour hole correlates with the pier Reynolds number. At low Reynolds numbers, the depth of scour was about the same all around the piers. At higher Reynolds numbers, the scour holes developed mainly behind the piers with much less scour in front of the piers. It was also found that the extrapolated equilibrium scour depth correlates well with the pier Reynolds number and that the Froude number and relative water depth did not have a significant effect on the scour depth for these experimental conditions.  相似文献   
5.
SRICOS: Prediction of Scour Rate in Cohesive Soils at Bridge Piers   总被引:2,自引:0,他引:2  
A new method called SRICOS is proposed to predict the scour depth z versus time t around a cylindrical bridge pier of diameter D founded in clay. The steps involved are: (1) taking samples at the bridge pier site; (2) testing them in an erosion function apparatus to obtain the scour rate ? versus the hydraulic shear stress applied τ; (3) predicting the maximum shear stress τmax, which will be induced around the pier by the water flowing at vo before the scour hole starts to develop; (4) using the measured ? versus τ curve to obtain the initial scour rate ?i corresponding to τmax; (5) predicting the maximum depth of scour zmax for the pier; (6) using ?i and zmax to develop the hyperbolic function describing the scour depth z versus time t curve; and (7) reading the z versus t curve at a time corresponding to the duration of the flood to find the scour depth that will develop around that pier. A new apparatus is developed to measure the ? versus t curve of step 2, a series of advanced numerical simulations are performed to develop an equation for the τmax value of step 3, and a series of flume tests are performed to develop an equation for the zmax value of step 5. The method is evaluated by comparing predictions and measurements in 42 flume experiments.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号