排序方式: 共有18条查询结果,搜索用时 953 毫秒
1.
2.
In order to implement the rigid constraint system for water resources and promote refined management of water resources, based on the analysis of the concept and notion of “basing four aspects on water resources” and the summary of the experience of water resources management, the basic theory and management guidelines for water resources control of “basing four aspects on water resources” are proposed. The latest progress of “ basing four aspects on water resources” is systematically sorted out, and it is pointed out that further research on the water resources control of “basing four aspects on water resources” should be deepened from the aspects of macro-system evaluation system construction, water resources optimization allocation model reconstruction, and refinement of water resources control system. © 2023, Editorial Board of Water Resources Protection. All rights reserved. 相似文献
3.
为了摸清澜沧江-湄公河流域各国对水资源开发利用和需求情况,首先概述了澜沧江-湄公河流域水资源分布情况和流域内各国开发利用现状,其次基于各国的实际经济发展情况,分析了各国的用水需求。分析表明:在水资源开发利用方面,各国主要在航运、水电、灌溉、渔业养殖等方面对水资源进行开发利用,但受水资源分配不均和各国开发技术水平差异的影响,整体开发水平不高。在水资源需求方面,各国对澜沧江-湄公河流域水资源依赖程度差异较大,依赖程度最大的是柬埔寨,其次是越南、泰国、老挝、缅甸,中国依赖程度最小。受人类活动和气候变化的影响,未来各国对澜沧江-湄公河流域水资源需求将会更加多元化和复杂化,在水资源安全保障方面还需继续加强合作和积极应对。 相似文献
4.
5.
提高堰塞湖入湖径流量预报的准确性对其下游洪水灾害的预警与预防具有重要意义,但由于堰塞湖往往形成于缺乏观测资料的山区,给预报工作带来了很大困难。为解决上述技术难题,本文采用将具有物理机制的WEP分布式水文模型与热带降雨测量卫星的降雨数据(TRMM_PR)相结合的方法,以2008年5月12日四川汶川大地震形成的唐家山塞湖为研究对象,对其入湖径流量进行了逐日模拟预报。首先,由1:250000的DEM数据生成研究区域(12029.25km2)内的数字水系,并收集了相关的三期土地利用(1985、2000、2005年)、土壤等下垫面数据;然后,采用研究时段内4个气象站逐日降水、气温、日照时数、风速、相对湿度数据作为输入来驱动模型,并选择区内4个水文站1976-1980年的月均径流观测数据对模型进行验证;最后,为提高模拟预报精度,下载了热带降雨测量卫星的TRMM_PR数据,对模型的降水输入进行了改进。结果显示:利用地面气象站点观测降水数据对TRMM_PR数据进行修正后,可在一定程度上改善模型的降水输入,有利于提高模型的径流预报精度。 相似文献
6.
7.
8.
变化环境下白洋淀湿地演变驱动机制分析 总被引:2,自引:0,他引:2
随着人口增加和社会经济发展,白洋淀湿地的生态用水与生态用地被严重挤占,导致湿地面积严重萎缩、流域景观破碎化程度加剧。运用小波分析法和马尔科夫预测方法分别研究白洋淀湿地降水、气温演变规律及土地类型的转变情况,从自然和社会两方面探究变化环境下白洋淀湿地演变驱动机制。结果表明,白洋淀流域降雨量减少,气温升高,气候发展总趋势向着暖干方向发展,生态用地将进一步被挤占,水面和滩地面积将大幅度减少,在社会变化环境驱动下白洋淀的生态系统将更加脆弱。 相似文献
10.