首页 | 本学科首页   官方微博 | 高级检索  
     


Resource Sharing in Linear Construction
Authors:Srilal Perera
Affiliation:Lect., Construction Engrg. and Management, Dept. of Civ. Engrg., Univ. of the West Indies, St. Augustine, Trinidad
Abstract:In the method developed, the conventional method of allocating resources are not used. Instead, resource‐hour units are employed. This enables to allocate resources precisely and the analysis becomes realistic unlike any other method. The method uses linear programming to determine the maximum rate of construction and the resource requirements in various activities. Sharing of resources which are available in limited quantities and balanced trades are all catered for in this development. The economics of using additional resources, working overtime and the optimal usage of all resources are the more important aspects of this paper. The step by step process of introducing additional resources and overtime ease the decision making process considerably. The method also helps to determine whether it is more economical to invest in additional resources or introduce work on overtime. If there is no proper method to compute resource requirements, a considerable waste in resource utilization would result. If resources are under utilized, even by a very small quantity, a considerably large delay of time would incur.
Keywords:Computer programming  Construction equipment  Construction management  Resource allocation  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号