火电机组甩50%负荷试验操作浅析 |
| |
作者姓名: | 耿学军 张承宗 梁海龙 余磊 周超 |
| |
作者单位: | 黄冈大别山发电有限责任公司;湖北方源东力电力科学研究有限公司 |
| |
摘 要: | 对于火电机组甩负荷试验,高压旁路控制是一个重点。实例呈现未设置快开保护功能的小容量启动旁路如何手动控制旁路开度,该做哪些准备,以完成机组甩50%负荷试验。同时,阐述甩50%负荷试验前及试验中的注意事项,以期为同类型启动旁路机组甩负荷试验提供参考。
|
关 键 词: | 火电机组 甩负荷 旁路控制 |
Analysis on Operation of 50%Load Rejection Test of Thermal Power Unit |
| |
Authors: | GENG Xuejun ZHANG Chengzong LIANG Hailong YU Lei ZHOU Chao |
| |
Affiliation: | (Dabieshan Power Generation Co.,Ltd.of Huanggang,Macheng 438300,Hubei,China;Fangyuan Dongli Electric Power Science&Research Co.,Ltd.of Hubei,Wuhan 430077,Hubei,China) |
| |
Abstract: | High-voltage bypass control is a key point in load rejection test of thermal power units.This paper presented an ex-ample of how to manually control the bypass opening of small capacity start-up bypass without quick opening protection function,and what preparations should be made to complete the 50%load rejection test of the unit.At the same time,the matters needing attention before and during the 50%load rejection test were described.It can be used as a reference for load rejection test of the same type of start-up bypass units. |
| |
Keywords: | thermal power unit load rejection bypass control |
本文献已被 维普 等数据库收录! |
|