首页 | 本学科首页   官方微博 | 高级检索  
     


Parallel disassembly sequence planning for complex products based on fuzzy-rough sets
Authors:Xiu Fen Zhang  Gang Yu  Zhi Yong Hu  Cheng Hui Pei  Guo Qiang Ma
Affiliation:1. The College of Mechanical Engineering, Inner Mongolia University of Technology, Hohhot, 010051, China
2. The Inner Mongolia Technical College of Mechanics and Electrics, Hohhot, 010070, China
Abstract:The goal of the parallel disassembly sequence planning (PDSP) is to find an optimal feasible disassembly task sequence with many constraints. Due to the PDSP of complex product is restricted by various factors, the DPSP problem is not easily solved in a general form. In order to reduce the time complexity, this paper presents a PDSP method based on fuzzy-rough sets. Five disassembly factors including assembly constraints factor, disassembly precedence factor, disassembly time factor, disassembly tool factor, and combination type factor are defined and formulated. In light of the characteristics of PDSP, the fuzzy-rough set mapping model of parallel disassembly is constructed. The components to be disassembled are taken as knowledge universe, and disassembly membership function as objection function is defined as the indiscernibility relation. Then, the fuzzy-rough set mapping model of parallel disassembly is adopted to generate the optimum parallel disassembly sequence. Finally, two examples validate the proposed method.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号