首页 | 本学科首页   官方微博 | 高级检索  
     

新桥硫铁矿注浆帷幕截流方案的可行性研究
引用本文:胡国信.新桥硫铁矿注浆帷幕截流方案的可行性研究[J].矿业研究与开发,2001,21(5):26-27,50.
作者姓名:胡国信
作者单位:铜陵化工集团新桥矿业有限公司
摘    要:新桥硫铁矿在采用注浆帷幕截流技术进行二期矿区防治水的可行性研究时,开展了水文地质补勘和钻孔注浆试验,证实了帷幕截流方案的必要性与可能性,在帷幕注浆参数、注浆工艺及材料选取等方面积累了一定的经验。

关 键 词:地下水防治  帷幕注浆  截流方案  硫铁矿  水文地质  治水措施
文章编号:1005-2763(2001)05-0026-03

Feasibility Study on Groundwater Flow Cut-Off by Grout Curtain in Xingqiao Pyrite Mine
HU Guo,xin.Feasibility Study on Groundwater Flow Cut-Off by Grout Curtain in Xingqiao Pyrite Mine[J].Mining Research and Development,2001,21(5):26-27,50.
Authors:HU Guo  xin
Abstract:In a feasibility study on water control in the second phase of the mining project, groundwater flow will be cut-off by grouted curtain. To do so, Xingqiao Pyrite Mine has performed supplementary hydrogeological survey and drill hole grouting experiments. The results have confirmed the necessity and feasibility of the groundwater flow cut-off method by grout curtain. Experiences have been gained in parameters design, grouting technology and raw materials selection for the grout curtain.
Keywords:Ground water control  Curtain grouting  Flow cut-off
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《矿业研究与开发》浏览原始摘要信息
点击此处可从《矿业研究与开发》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号