首页 | 本学科首页   官方微博 | 高级检索  
     

混凝土面板堆石坝运行期存在的渗流问题及成因研究综述
引用本文:孙玉莲,兰驷东,严俊,宋禄根. 混凝土面板堆石坝运行期存在的渗流问题及成因研究综述[J]. 中国水利水电科学研究院学报, 2016, 0(6): 431-436,442
作者姓名:孙玉莲  兰驷东  严俊  宋禄根
作者单位:内蒙古机电职业技术学院 水利与土木建筑工程系, 内蒙古 呼和浩特 010070,北京市京密引水管理处, 北京 101400,中国水利水电科学研究院 流域水循环模拟与调控国家重点实验室, 北京 100048,云南建工水利水电建设有限公司, 云南 昆明 650224
基金项目:国家973计划课题(2014CB047004);国家自然科学基金项目(51409278);中国水利水电科学研究院专项(1243)
摘    要:
混凝土面板是作为面板堆石坝的主要防渗结构,承受较大的水头落差,其对于坝体渗流的安全稳定性至关重要,但是在运行期常存在一些渗流问题。本文在研究混凝土面板坝运行期渗流安全的基础上,分析了国内外混凝土面板坝渗流破坏的典型案例,总结了面板破坏的主要渗流问题模式,包括裂缝渗流、局部破损渗漏和防渗设计缺陷渗漏等,并在此基础上,对不同破坏模式的成因进行了分析,研究成果可为同类工程防渗设计及渗流控制提供参考。

关 键 词:混凝土面板堆石坝  运行期  渗流问题  成因分析
收稿时间:2016-04-20

Research on seepage problem and character of concrete face rock-fill dam under operating period
SUN Yulian,LAN Sidong,YAN Jun and SONG Lugen. Research on seepage problem and character of concrete face rock-fill dam under operating period[J]. Journal of China Institute of Water Resources and Hydropower Research, 2016, 0(6): 431-436,442
Authors:SUN Yulian  LAN Sidong  YAN Jun  SONG Lugen
Affiliation:Inner Mongolia Technical of Mechanics And Electrics, Inner Mongolia, Huhehot 010070, China,Beijing Beijing-Miyun water management office 101400, China,State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100048, China and Yunnan Water Conservancy and Hydropower Construction Co., Ltd, Kunming 650224, China
Abstract:
As the main anti-seepage structure of concrete face rock-fill dam,concrete face bears high wa-ter-head,which is vital to the seepage stability and safety of the dam. However,there are often some seep-age problems in the operating period. In this paper, in order to research the seepage safety for concrete face rock-fill dam, some typical seepage damage cases of concrete face dam both at home and abroad are analyzed. The related main damage modes are then summarized, such as cracks, local broken region and structural design problem. On this basis, the seepage causes of the dam under various damage modes are analyzed. The results can provide a good reference of the seepage control design for similar projects.
Keywords:concrete face rock-fill dam  operating period  seepage problem  causes analysis
点击此处可从《中国水利水电科学研究院学报》浏览原始摘要信息
点击此处可从《中国水利水电科学研究院学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号