首页 | 本学科首页   官方微博 | 高级检索  
     


Demonstration of 2.488 Gbit/s transmission on the UK—Channel Islands No 7 submarine cable system
Authors:R B J Lewis  L N Barker  E G Bryant  S F Carter  D M Spirit  T Widdowson  J V Wright
Abstract:The recently-installed UK—Channel Islands No 7 cable system is a 132 km unrepeatered, twelve optical fibre, 140 Mbit/s system. In February the cable was used for a series of tests to demonstrate new transmission and receiver equipment developed at British Telecom Research Laboratories (BTRL). The paper describes first the use of erbium fibre power amplifiers to achieve two-way transmission over the system at 2.488 Gbit/s, and then the testing of a novel semi-ruggedised laser PIN receiver.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号