首页 | 本学科首页   官方微博 | 高级检索  
     

雪灾影响下接触网的负载计算
引用本文:隆超,徐海东,杨嵘春,曹毅峰. 雪灾影响下接触网的负载计算[J]. 电气技术, 2009, 0(1)
作者姓名:隆超  徐海东  杨嵘春  曹毅峰
作者单位:西南交通大学电气工程学院,成都,610031
摘    要:
2008年,初南方的雪灾使接触网覆冰严重,给铁路的正常运行造成了极大的困难,个别地方出现了独立锚柱拉断的现象。如何计算雪灾影响下接触网的负载,确保电气化铁道在恶劣气候条件下正常运行是电气化铁道面临的一个重要问题。

关 键 词:接触网覆冰  冰负载  合成负载

The Load Calculation of the OCS Which was Affected by the Snow Disaster
Long Chao,Xu Haidong,Yang Rongchun,Cao Yifeng. The Load Calculation of the OCS Which was Affected by the Snow Disaster[J]. Electrical Engineering, 2009, 0(1)
Authors:Long Chao  Xu Haidong  Yang Rongchun  Cao Yifeng
Affiliation:Long Chao Xu Haidong Yang Rongchun Cao Yifeng(School of Electric Engineering; Southwest Jiaotong University; Chengdu 610031);
Abstract:
South snow disaster in early 2008 made the OCS ice-coated severely,caused great difficulties to the normal operation of the railway,such as the breakdown of individual anchor mast.How to calculate the load of the OCS under the influence of snow disaster,to ensure that the electrified railway in bad weather conditions' normal operation is an important issue.
Keywords:ice coating of OCS  ice load  synthetic load  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号