基于DEMATEL方法的装配式混凝土构件吊装效率影响因素分析
引用本文:陈小波,甘凯馨,崔平.基于DEMATEL方法的装配式混凝土构件吊装效率影响因素分析[J].工程管理学报,2019,0(6):111-115.
作者姓名:陈小波  甘凯馨  崔平
作者单位:东北财经大学 投资工程管理学院,辽宁 大连 116025;东北财经大学 投资工程管理学院工程管理研究中心,辽宁 大连 116025;中建二局熊兵劳模创新工作室,北京,100160
基金项目:国家自然科学基金;大连市青年科技之星项目
摘    要:装配式建筑是当前建筑行业发展的重要趋势,装配式建筑的主要形式之一是 PC 结构。与传统的现浇建筑模式相比,预制构件现场装配是装配式建筑建造模式的独有特点,因此装配式建筑中 PC 构件的吊装效率是影响项目整体进度的关键因素。从外部环境、构件、机械设施、方法、工人 5 个方面分析影响装配式建筑构件吊装效率的因素,采用 DEMATEL 分析方法确定每个影响因素之间的影响关系,得出了关键影响因素,如工人工作时间较长,施工效率低下、构件安装顺序错乱等,进而对于指导装配式建筑吊装方案的制定起到一定借鉴意义。

关 键 词:装配式建筑  PC构件  吊装效率  DEMATEL

Analysis of the Influencing Factors of Lifting Efficiency of PrefabricatedConcrete Components Based on DEMATEL Method
CHEN Xiao-bo,GAN kai-xin,CUI Ping.Analysis of the Influencing Factors of Lifting Efficiency of PrefabricatedConcrete Components Based on DEMATEL Method[J].Journal of Engineering Management,2019,0(6):111-115.
Authors:CHEN Xiao-bo  GAN kai-xin  CUI Ping
Affiliation:1,2. School of Investment & Construction Management,Dongbei University of Finance & Economics;1,2. Construction Management Research Center,School of Investment & Construction Management,Dongbei University of Finance & Economics;3. China Construction Second Bureau Xiong Bing Model Innovation Studio
Abstract:Using prefabricated technique is an important trend in the current construction industry. One of the main forms ofprefabricated building is the PC structure. Compared with the traditional cast-in-place construction mode,on-site assembly is theunique characteristic of the prefabricated construction mode. Therefore,the lifting efficiency of PC components in prefabricatedbuildings is a key factor affecting the overall progress of the project. This paper analyzed the factors that affect the hoisting efficiencyof building components assembly from five aspects:external environment,components,mechanical facilities,methods and workers.The DEMATEL analysis was used to determine the relationship between each factor and obtained the key influencing factors,such aslong working hours,low construction efficiency and disordered component installation sequence. Furthermore,the findings of thisstudy can be used as references for guiding the formulation of hoisting scheme of prefabricated buildings.
Keywords:prefabricated concrete  PC Component  hoisting efficiency  DEMATEL