首页 | 本学科首页   官方微博 | 高级检索  
     

输变电系统可靠性评估中设备故障率预测方法研究
引用本文:李莉,熊炜,陆冬梅,龙燕,袁旭峰,邹晓松.输变电系统可靠性评估中设备故障率预测方法研究[J].电测与仪表,2015,52(3):37-41.
作者姓名:李莉  熊炜  陆冬梅  龙燕  袁旭峰  邹晓松
作者单位:1. 贵州电力试验研究院,贵阳,550001
2. 贵州大学,贵阳,550025
基金项目:贵州省科技厅基金资助项目(黔科合J字[2011]2060号)
摘    要:由于输变电设备在地域分布上的复杂性、运行状态的随机多样性,使得输变电设备故障率具有时变性、随机性等特点。同时由于反映设备故障的信息获取困难,故难以应用常规的回归分析法、分解分析法等时间序列分析法建立准确的故障率预测模型。文中以全网输变电设备故障率为研究对象,提出了一种基于自回归-移动平均混合模型(ARMA模型)的输变电设备故障率预测方法,克服了常规解析法进行输变电设施可靠性评估信息获取困难的缺点,能有效提高全网输变电设施可靠性评估的合理性和准确性。最后,对220k V输电线路故障率进行了预测,结果表明,所提预测模型具有较高的精度,能够满足实际工程的应用要求。

关 键 词:输变电系统  可靠性评估  设备故障率预测  ARMA模型
收稿时间:2014/4/16 0:00:00
修稿时间:2014/4/16 0:00:00

A prediction method for failure rate of equipments in reliability evaluation of power transmission system
Li Li,Xiong Wei,Long Yan,Lu Dongmei,Yuan Xufeng and Zou Xiaosong.A prediction method for failure rate of equipments in reliability evaluation of power transmission system[J].Electrical Measurement & Instrumentation,2015,52(3):37-41.
Authors:Li Li  Xiong Wei  Long Yan  Lu Dongmei  Yuan Xufeng and Zou Xiaosong
Affiliation:Li Li;Xiong Wei;Lu Dongmei;Long Yan;Yuan Xufeng;Zou Xiaosong;Guizhou Test and Research Institute of Power System Equipment;Guizhou University;
Abstract:Accurate predicting of failure rate of power transmission equipments can enhance credibility of reliability assessment for transmission systems and its prediction results, so as to improve the reliability management level of power transmission system. However, due to the complexity of power transmission equipments distributed geographically, and randomness and diversity of operation states, the failure rate of power transmission equipments have characteristics of time-varying and stochastic. As it is difficult to obtain the information reflecting equipment faults, conventional methods of regression analysis and decomposition analysis and time series analysis could not be used to establish accurate prediction model of failure rate. This paper presents a predicting method of transmission failure rate based on autoregressive-moving average(ARMA) model in order to adapt to time variation and randomness of equipment failure rate of power transmission system. The method is focused on equipment failure rate of whole power transmission system without the difficulty of obtaining information for reliability evaluation in conventional analytic methods, and less information is needed. So the validity and accuracy of reliability evaluation for equipments in whole transmission system are improved effectively. Finally, the method is used to predict the failure rate of a provincial 220kV power transmission system. The results have shown that the method has high accuracy, and can be applied to engineering practice to improve stability of power systems .
Keywords:power transmission and transformation system  reliability evaluation  prediction of equipment failure rate  ARMA model
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电测与仪表》浏览原始摘要信息
点击此处可从《电测与仪表》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号