本文在Bass模型原理的基础上,建立了关于政府投资、成本对超临界机组和超超临界机组的扩散影响模型,同时考虑了超临界机组和超超临界机组的竞争。研究发现:(1)超临界机组和超超临界机组的成本,对其扩散影响较小,而政府投资对超临界机组和超超临界机组的扩散影响较大;(2)在1.5倍和2倍于当前投资情景下,不同政府投资影响率下(Q值不同),超临界机组的最大市场装机容量分别为494.59,558.39,622.20 GW和434,518,602 GW,而超超临界机组的分别为905.42,841.61,777.81 GW和966,882,798 GW;(3)超临界机组和超超临界机组都将在2025年左右完成扩散过程。

关 键 词:超临界机组   超超临界机组   Bass模型  

Diffusion Scene Analysis on Supercritical Unit and Ultra Supercritical Units Based on Bass Model
ZHU Kaiwei,LIU Zhen,LYU Zhichen,PU Gangqing,GUO Wei. Diffusion Scene Analysis on Supercritical Unit and Ultra Supercritical Units Based on Bass Model[J]. Electric Power Construction, 2015, 36(6): 128-133. DOI: 10.3969/j.issn.1000-7229.2015.06.022
Authors:ZHU Kaiwei  LIU Zhen  LYU Zhichen  PU Gangqing  GUO Wei
Affiliation:1. Institute of Business Administration, Chongqing University of Technology, Chongqing 400054, China;2. Institute of Energy, Environment and Economic, Tsinghua University, Beijing 100084, China;3. Institute of mechanical engineering, Chongqing University of Technology, Chongqing 400054, China
Abstract:
Based on the principle of Bass model, a new model was established for the diffusion effects of the government investment, cost on supercritical units and ultra supercritical unit, with considering the the competition of supercritical units and ultra supercritical units . Research shows that :(1) compared to the affect of government invest, the cost of supercritical units and ultra supercritical units has less effect to their diffusion trend; (2)in 1.5 times and 2 times of the current investment situation, under the different Q value, the supercritical units eventually installed capacity are about 494.585, 558.39, 622.20 GW and 434, 518, 602 GW while the ultra supercritical units eventually installed capacity are about 905.42, 841.61, 777.81 GW and 966, 882, 798 GW; (3)around 2025 supercritical units and ultra supercritical units will both complete the diffusion process.
Keywords: supercritical units  ultra supercritical units  Bass diffusion mode  