喜河水力发电厂3号发电机的进相运行与试验
引用本文:佘晓军.喜河水力发电厂3号发电机的进相运行与试验[J].西北水力发电,2007,23(3):119-122.
作者姓名:佘晓军
作者单位:陕西汉江投资开发有限公司喜河水力发电厂,陕西石泉725271
摘    要:电力系统中采用电机进相运行(欠励),是平衡无功、调节电压最简便、经济的措施。由于发电机进相运行受到一些因素的限制,在发电机采用进相运行前,应对发电机进行进相运行能力试验,确定发电机进相深度,确保发电机进相运行时的稳定安全。

关 键 词:水轮发电机  进相运行  静稳曲线
文章编号:1671-4768(2007)03-0119-04
修稿时间:2007-05-12

Leading Phase Operation of No. 3 Generator in Xihe Hydropower Station and Test
SHE Xiao - jun.Leading Phase Operation of No. 3 Generator in Xihe Hydropower Station and Test[J].Journal of Northwest Hydroelectric Power,2007,23(3):119-122.
Authors:SHE Xiao - jun
Affiliation:Shaanxi Hanjiang River Investment Co- Lt, Xihe power plant, Shaanxi Shiuan 725271,China
Abstract:Leading phase operation of generator in power system is a simple and effective measure to balance the wattless power and to regulate the voltage. Because the leading phase operation is restricted by some factors, before leading phase operation the generator performance should be tested, so that the depth of leading phase may be determined in order to ensure the safety when generator operation under the leading phase condition.
Keywords:turbine-generator unit  leading phase operation  static stability curve