喜河水电站施工进度优化设计与实践
引用本文:郭清,王建文,周建新.喜河水电站施工进度优化设计与实践[J].西北水力发电,2007,23(3):62-65.
作者姓名:郭清  王建文  周建新
作者单位:北京国电水利电力工程有限公司,北京100024
摘    要:由于汉江洪水峰高量大、陡涨陡落,喜河水电站施工规划充分结合宽河床、低水头、大泄量、分三期施工导流的特点,以尽量提前下闸蓄水、首台机组提前发电为基础,通过科学、合理的施工进度优化设计,使电站提前半年并网发电。

关 键 词:喜河水电站  施工三期导流  进度优化设计
文章编号:1671-4768(2007)03-0062-04
修稿时间:2007-05-12

Optimal Design of Construction Schedule and Practice of Xihe Hydropower Station
GUO Qing, WANG Jian- wen, ZHOU Jian- xin.Optimal Design of Construction Schedule and Practice of Xihe Hydropower Station[J].Journal of Northwest Hydroelectric Power,2007,23(3):62-65.
Authors:GUO Qing  WANG Jian- wen  ZHOU Jian- xin
Affiliation:Beijing National Hydro- electricity Ltd, Beijing 100024, China
Abstract:The floods of the Hanjiang River have the features of high peak flow with abrupt rise and recessionl the construction plan of Xihe hydropower station would be considered the physical features of wide river course with low water head, large discharge, and construction by stages. In order to make the station put into operation ahead of schedule, namely storing water and generate electricity ahead of schedule, the optimal design of construction schedule was adopted, by which the power station was connected into power grid and generate electricity half year ahead of time.
Keywords:Xihe hydropower station  phase three construction diversion  optimal design of construction schedule