首页 | 本学科首页   官方微博 | 高级检索  
     


Use of TBM muck as construction material
Authors:L. Gertsch   A. Fjeld   B. Nilsen  R. Gertsch
Affiliation:
Available online 11 April 2001.
Abstract:Tunnel boring machines (TBMís) are widely used in tunnel construction in rock. The rock chips (muck) produced are rarely used for construction applications, however, because the suitability of the material is not well understood. Yet the cuttings appear to be of approximately the correct average size for some applications. If they are suitable in other respects, cost savings can be realized in tunnel construction, where aggregate is a common requirement. A review of standard construction aggregate specifications indicates that hardrock TBM much would be suitable for several construction applications with a minimum of processing: road pavement and structural concrete. Processing options also are discussed for cases where the raw TBM muck is nearly, but not quite, suitable. A 0.65 metric ton (1420 lb) cutting sample generated by a laboratory tunnel boring machine operating in a welded tuff is analyzed for suitability for different construction applications. In addition, numerous tunneling projects that use or have studied TBM waste for construction purposes are described.
Keywords:Abbreviations: AASHTO American Association of State Highway and Transportation Officials AREA American Railway Engineering Association ASTM American Society for Testing and Materials CBR California Bearing Ratio CEN Comité Européen de Normalisation (European Committee for Standardization) EN European Standard NPRA Norwegian Public Roads Administration NTH Norwegian Institute of Technology (NTNU since merger in 1996) NTNU Norwegian University of Science and Technology prEN European Prestandard TBM tunnel boring machines
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号