首页 | 本学科首页   官方微博 | 高级检索  
     

鲁布革水电站右岸泄洪洞漏水处理
引用本文:刘金洪. 鲁布革水电站右岸泄洪洞漏水处理[J]. 大坝与安全, 2008, 0(5)
作者姓名:刘金洪
作者单位:南方电网调峰调频发电公司鲁布革水力发电厂,云南,罗平,655800
摘    要:鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。自投运以来,事故门下游侧隧洞左边墙漏水较为严重,一直未得到有效解决,2006年进行化学灌浆处理,效果良好,消除了安全隐患。

关 键 词:隧洞  漏水  处理  鲁布革水电站

Seepage treatment of right hank spillway tunnel at Lubuge hydropower station
LIU Jin-hong. Seepage treatment of right hank spillway tunnel at Lubuge hydropower station[J]. Large Dam & Safety, 2008, 0(5)
Authors:LIU Jin-hong
Abstract:The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.But,since operation,seepage at left side wall of tunnel downstream emergency gate was serious.In the year of 2006,chemical grouting was carried out and was of good effect.
Keywords:tunnel  seepage  treatment  Lubuge hydropower station  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号