三峡水电站坝后钢衬钢筋混凝土压力背管的非线性有限元分析
引用本文:刘幸,张立军,贺斌,方梅.三峡水电站坝后钢衬钢筋混凝土压力背管的非线性有限元分析[J].水电站设计,2001,17(1):9-11,8.
作者姓名:刘幸  张立军  贺斌  方梅
作者单位:武汉水利电力大学,
摘    要:采用钢筋混凝土非线性有限元方法,对三峡水电站钢衬钢筋混凝压力管道结构进行了计算,求得了各种钢材配置下的荷载效应并进行了相应的分析。

关 键 词:压力水道  背管  结构计算  三峡水电站  钢筋混凝土
文章编号:1003-9805(2001)01-0009-03

Non-linear Finite Element Analysis for Steel-lined Reinforced Concrete Penstock Behind Dam of Three Gorges Hydroelectric Plant
LIU Xing,ZHANG Li-jun,HE Bin,FANG Mei.Non-linear Finite Element Analysis for Steel-lined Reinforced Concrete Penstock Behind Dam of Three Gorges Hydroelectric Plant[J].Design of Hydroelectric Power Station,2001,17(1):9-11,8.
Authors:LIU Xing  ZHANG Li-jun  HE Bin  FANG Mei
Abstract:By applying non-linear finite element method for reinforced concrete,the steel-lined reinforced concrete penstock structure of Three Gorges Hydroelectrical Plant is calculated,the loading effect under different steel disposition obtained and the corresponding analysis conducted.
Keywords:steel  lining  steel  reinforced  concrete  penstock  structune  calculation  stress-strain  relationship  FEM  Three  Gorges  Hydroelectric  Plant  