乌江渡发电厂扩建工程环境问题和保护
引用本文:张体忠. 乌江渡发电厂扩建工程环境问题和保护[J]. 贵州水力发电, 2004, 18(1): 13-15
作者姓名:张体忠
作者单位:乌江渡发电厂,贵州,遵义,563003
摘    要:
乌江渡发电厂扩建工程施工中为减少环境损失,针对施工中“三废”及噪声的影响、开挖爆破对现有建筑物的影响、开挖弃渣对周围环境及水土保持的影响,以及对施工区卫生与人群健康与水库水质的影响等,采取了一系列有效的处理与防护措施,使施工对建设区的局部污染和破坏现象降到了最低程度,取得了较好的环境保护效果。

关 键 词:乌江渡发电厂 扩建工程 环境保护 水土保持 水质
文章编号:1007-0133(2004)01-0013-03
修稿时间:2003-12-03

Environmental Question and Protection of Wujiangdu Power Plant's Extension Project
ZHANG Ti-zhong. Environmental Question and Protection of Wujiangdu Power Plant's Extension Project[J]. Guizhou Water Power, 2004, 18(1): 13-15
Authors:ZHANG Ti-zhong
Abstract:
In order to mitigate the adverse effects of Wujiangdu power plant's extension project constructing to environment, such as influence of"three wastes"and noise in constructing,impact of excavating and blowing up on existing the structures,excavating and abandon impact on surrounding environment and water and soil conservation,as well as the impact on hygiene and crowd's health and reservoir water quality in the construction area and etc.,a series of effective treatment and safeguard measures had taken.That had made the pollution and destruction in parts of the construction area reduce to the lowest degree,and had made better environmental protection result.
Keywords:environmental protection  environment design  appraise in advance  measure  Wujiangdu power plant's extension project