首页 | 本学科首页   官方微博 | 高级检索  
     

地铁车站主要施工工法比较与浅析
引用本文:盛莉. 地铁车站主要施工工法比较与浅析[J]. 安徽建筑, 2009, 16(3): 51-53
作者姓名:盛莉
作者单位:中铁十二局集团第二工程有限公司,山西,太原,030032
摘    要:
根据地铁车站的功能、所处的周边环境和水文地质条件、施工的难易程度以及施工期间对交通和居民生活的影响等因素,介绍了在地铁车站施工中经常采用的几种主要施工工法。并对这些工法进行了比较,分析了这些工法的各自适用条件和优缺点。

关 键 词:地铁车站  施工工法  比较与探讨

Comparison and Approach of Main Construction Methods for Subway Station
Sheng Li. Comparison and Approach of Main Construction Methods for Subway Station[J]. Anhui Architecture, 2009, 16(3): 51-53
Authors:Sheng Li
Affiliation:The 2nd Engineering Co.;Ltd. of the 12th Bureau Group of China Railway;Taiyuan 030032;China
Abstract:
The article presents the several main construction methods for subway station and makes comparison of them on terms such as function of the subway station, surrouding environment and hydrologic conditions, the level of construction difficulty and influence of construction on traffic flow and people's life. It then dissects the different applied circumstances and merits of different construction methods.
Keywords:subway station  construction method  comparison and approach  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号