煤矿井塔滑一浇一施工
引用本文:刘续光.煤矿井塔滑一浇一施工[J].建筑技术,1999,30(7):469-471.
作者姓名:刘续光
作者单位:山东新汶矿业集团工程公司
摘    要:协庄矿副立进井塔为现浇钢筋混凝土箱形结构,采用滑一浇一工艺进行煤矿井塔施工,施工顺序为塔壁逐层滑升,梁板逐层跟进,施工中利用井塔屋面轻型网架结构作为滑模辅助操作平台,同步滑升,取得了较好的综合经济效益和社会效益。

关 键 词:煤矿建筑井塔施工缝
修稿时间:1999-03-22

SLIDING AND POURING METHOD,AN ALTERNATE PROCEDURE FOR THE CONSTRUCTION OF A COAL-MINE SHAFT WELL PROJECT
LIU Xuguang.SLIDING AND POURING METHOD,AN ALTERNATE PROCEDURE FOR THE CONSTRUCTION OF A COAL-MINE SHAFT WELL PROJECT[J].Architecture Technology,1999,30(7):469-471.
Authors:LIU Xuguang
Affiliation:LIU Xuguang
Abstract:The shaft well of the Xiezhuang Coal Mine has been designed of a poured-in-place reinfcrced concret box structure.Sliding and pouring method,an alternate procedure for the construction of a coal-mine shaft well project.The procedures are as following:1,the progress of each storey's construction has been carried out step by step duly 2,the construction of slabs and beams has been completed step by step appropriately and 3,during construction,the light-type network structure has been used as a complementary operating platform for the sliding formwork construction.These synchronization procedures have achieved comprehensive economic benefit and social efficiency.
Keywords:coal-mine building  shaft well  construction joint