首页 | 本学科首页   官方微博 | 高级检索  
     

地震荷载作用下中–缓倾角顺层开挖斜坡的变形破坏模型试验
引用本文:阿发友,孔纪名,倪振强.地震荷载作用下中–缓倾角顺层开挖斜坡的变形破坏模型试验[J].岩石力学与工程学报,2012(Z1):3437-3443.
作者姓名:阿发友  孔纪名  倪振强
作者单位:昆明理工大学国土资源工程学院;中国科学院成都山地灾害与环境研究所
基金项目:中国科学院知识创新工程重要方向项目(KKCX1–YW–03);云南省高校人才培养基金项目(KKSY201221121)
摘    要:在汶川地震灾区,顺层中–缓倾斜坡是地震山地灾害非常发育的斜坡类型,而开挖往往加剧斜坡的地震山地灾害。据调查,顺层中–缓倾斜坡以整体滑动为最主要的变形破坏形式。为重现斜坡的变形破坏过程,分析斜坡在地震荷载作用下的变形破坏规律,选取北川县陈家坝马滚岩滑坡作为顺层中–缓倾角开挖损伤斜坡的典型实例,进行地震荷载作用下斜坡变形破坏的室内物理模型试验。结果表明,开挖加剧斜坡在地震荷载作用下的变形破坏,整体滑动是斜坡最主要的破坏形式,与野外调查结果吻合。同时,斜坡整个变形破坏过程具有阶段性,可以划分为以下几个阶段:(1)地震初始阶段,此阶段坡体沿开挖不连续层面逐渐贯通并微剪出,同时开挖坡顶形成大量裂缝;(2)开挖坡顶浅表崩塌阶段;(3)整体滑动阶段。

关 键 词:边坡工程  顺层中–缓倾斜坡  开挖  地震荷载  变形破坏  模型试验

DEFORMATION AND FAILUER MODEL TEST OF MODERATE-SLOW DIP EXCAVATION BEDDING SLOPE UNDER ACTION OF SEISMIC LOAD
A Fayou,KONG Jiming,NI Zhenqiang.DEFORMATION AND FAILUER MODEL TEST OF MODERATE-SLOW DIP EXCAVATION BEDDING SLOPE UNDER ACTION OF SEISMIC LOAD[J].Chinese Journal of Rock Mechanics and Engineering,2012(Z1):3437-3443.
Authors:A Fayou  KONG Jiming  NI Zhenqiang
Affiliation:1.Faculty of Land Resource Engineering,Kunming University of Science and Technology,Kunming,Yunnan 650093,China;2.Institute of Mountain Hazards and Environment,Chinese Academy of Sciences,Chengdu,Sichuan 610041,China)
Abstract:In the Wenchuan earthquake disaster area,moderate-slow dip bedding slope is a kind of slope that seismic mountain disaster is very developing and the slope earthquake disaster is often exacerbated by the excavation.According to the survey,integral sliding is the main deformation and destruction form of moderateslow dip bedding slope.In order to reproduce the process and analysis regularity of slope deformation and failure under the action of seismic load,Magunyan landslide located in Beichuan County is chosen as the typical example of moderate-slow dip excavation damage bedding slope;and the indoor physical model test of slope deformation and failure under the action of seismic load are carried out.The results show that slope deformation and failure under the action of seismic load is intensified by the excavation.Integral sliding is the main form of deformation and failure;and the results are consistent with field investigation.From the whole process of deformation and failure of bedding slope,the slope can be divided into the three stages:(1) Initial phase of the earthquake.The slope gradually breakthrough and slightly cuts out along the discontinuous bedding plane induced by excavation,and large cracks appear at the top of excavation slope.(2) Shallow landslides phase at top of excavation slope;(3) Integral sliding phase.
Keywords:slope engineering  moderate-slow dip bedding slope  excavation  seismic load  deformation and failure  model test
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号