摘    要:马钢2500m^3高炉休风前准备充分,休风料装入合适,休风过程中对炉顶温度和炉顶齿轮箱的温度控制较好,结果料面安全顺利地降到了风口中心线以下。

关 键 词:高炉 降料面操作 休风 休风料
修稿时间:2001-06-18

Operation of lowering charge level of Maanshan Steel''''s 2500 m3 BF
Wang Baoping. Operation of lowering charge level of Maanshan Steel''''s 2500 m3 BF[J]. Ironmaking, 2001, 20(5): 18-21
Authors:Wang Baoping
Abstract:Before lowering charge level of Maanshan Steel's 2 500 m3 BF ,a lot of preparations were made,the burden for blowing-out was charged resonably. During lowering charge level, BF top temperature and gearbox temperature were controlled correctly. As a result, the charge level was lowered down to below tuyere centerline successfully ,
Keywords:blast furnace lowering charge level operation