浍河水库左坝肩高压喷射注浆的设计方案选择与施工
引用本文:李兴梅.浍河水库左坝肩高压喷射注浆的设计方案选择与施工[J].山西水利科技,2006(1):41-43.
作者姓名:李兴梅
作者单位:临汾市水利机械工程局,临汾,041000
摘    要:文中介绍了浍河水库左坝肩多次出现渗漏的情况,并在选择了高喷灌浆防渗墙设计方案的基础上,进一步对防渗墙底的高程设计进行了优化选择,又在现场通过试验确定了高喷灌浆的施工参数,并依据这些施工参数进行了施工。

关 键 词:渗流  透水层  高喷灌浆  钻孔
文章编号:1006-8139(2006)01-41-03
修稿时间:2005年11月14

Selection of Design Plan of High-pressure Jet Grouting on Left Dam Abutment of Huihe Reservoir and its Construction
LI Xing-mei.Selection of Design Plan of High-pressure Jet Grouting on Left Dam Abutment of Huihe Reservoir and its Construction[J].Shanxi Hydrotechnics,2006(1):41-43.
Authors:LI Xing-mei
Affiliation:LI Xieng-mei
Abstract:This paper introduces the seepage situation of left dam abutment of Heihe Reservoir.On the basis of selected design plan of seepage-preventing wall formed by high-pressure jet grouting,the elevation design of the bottom of seepage-preventing wall had been further optimally selected and construction parameters of high-pressure jet grouting had been determined through test in construction site.According to these results,this project had proceeded.
Keywords:seepage flow permeable layer high-pressure jet grouting drill hole