首页 | 本学科首页   官方微博 | 高级检索  
     


Analysis of time-to-time variation of load on interchamber pillars in mines of the Upper Kama Potash Salt Deposit
Authors:A. A. Baryakh  S. Yu. Lobanov  I. S. Lomakin
Affiliation:1.Mining Institute, Ural Branch,Russian Academy of Sciences,Perm,Russia
Abstract:The procedure to estimate growth in load exerted on interchamber pillars with time is based on mathematical modeling of stresses and strains in structural elements of room-and-pillar mining method and on roof rock failure criteria. The calculation results illustrate a real time scale of variation in strength of rocks and the associated partial collapse of a parting and failure of edges of interchamber pillars when their height is increased.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号