首页 | 本学科首页   官方微博 | 高级检索  
     

?????L?????????????????
引用本文:李建华,樊泽兴,赵远峰.?????L?????????????????[J].物理测试,2012,30(4):19-21.
作者姓名:李建华  樊泽兴  赵远峰
作者单位:1. ?????????????????? ??? 210035 ; 2. ???????????? 401120
摘    要: 针对国内球扁钢、L型钢生产效率及成材率偏低的问题,从球扁钢、L型钢生产线设备选型与布置、轧件断面冷却不均、冷床预弯等方面围绕球扁钢、L型钢的长尺生产进行了技术分析。采用推钢式加热炉取代步进式加热炉、BD1+BD2+3机架水平连轧的布置形式、终轧后设置喷雾嘴对内侧表面进行强制冷却以及增加冷床预弯功能,可有效解决球扁钢、L型钢的长尺生产问题。

关 键 词:????  L???  ????????  

Analysis of Long-Sized Bulb-Flat Steel and L-Shape Steel
LI Jian-huaI,Nanjing Iron and Steel Co.,Ltd. FAN Ze-xingz,ZHAO Yuan-feng.Analysis of Long-Sized Bulb-Flat Steel and L-Shape Steel[J].Physics Examination and Testing,2012,30(4):19-21.
Authors:LI Jian-huaI  Nanjing Iron and Steel Co  Ltd FAN Ze-xingz  ZHAO Yuan-feng
Affiliation:1. Nanjing Iron and Steel Co., Ltd., Nanjing 210035,Jiangsu, China ;2. CISDI Group Co., Ltd., Chongqing 401120, China
Abstract:Aiming at the low production efficiency and yield of domestic bulb-flat steel and L-shape steel, relatively technology about bulb-flat steel and L-shape steel of selection, and arrangement of the production line equipment, uneven cooling of rolled piece section, preflex of cooling bed were systematical analyzed. To effectively solve the issues of producing long-sized bulb-flat steel and L-shape steel, some measures were put forward: replacing walking- beam furnace by pusher-type furnace ,installing the frame of horizontal continuous mill in the form of BD1 + BD2 + 3, installing spray nozzles to have inside surface forced cooling after finishing rolling,and adding the function of preflex to cooling bed.
Keywords:bulb-flat steel  L-shape steel  long steel production
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《物理测试》浏览原始摘要信息
点击此处可从《物理测试》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号