首页 | 本学科首页   官方微博 | 高级检索  
     


Multicriteria dimensioning of hard-finishing operations regarding cross-process interdependencies
Authors:Berend Denkena  Helge Henning
Affiliation:1. Institute of Production Engineering and Machine Tools (IFW), Leibniz Universit?t Hannover, 30823, Garbsen, Germany
Abstract:The production of high performance metal parts requires a well balanced sequence of operations and can usually technologically not be achieved in a single process. This issue leads to complex process chains on the shop floor and the requirement to split single processes into multistage processes in hard-finishing operations. In both cases, the objective for the process planning is to achieve not only a local optimum for the individual processes but rather an overall optimum for the complete sequence. In order to reach the overall optimum, the process planner needs to integrate the effects between the processes into consideration. These effects which are referred to as cross-process interdependencies lead to balanced settings of process parameters and results in a much more effective operation of the sequence. In this paper, a novel approach dealing with the integration of cross-process interdependencies in the hard-finishing process of multistage grinding is introduced. It is based on an a-priori multicriteria dimensioning procedure which allows the integration of cross-process interdependencies and is implemented in software programmed in JAVA. A multistage plunge grinding process for crankshaft journals is used for evaluation of the results predicted by a developed software prototype.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号