双圆盾构掘进中的地面沉降控制技术
引用本文:张明海.双圆盾构掘进中的地面沉降控制技术[J].中国市政工程,2009(5):54-55.
作者姓名:张明海
作者单位:上海申通地铁集团有限公司,上海,200031
摘    要:采用双圆盾构施工地铁隧道是解决地下工程空间利用的有效途径。介绍了上海市轨道交通10号线3标同济大学站—大连路站—邮电新村站区间隧道采用双圆盾构施工的方案。重点叙述了引起地面沉降的原因及控制地面沉降的措施。通过工程实际,测得双圆盾构施工中累计的最大沉降量为49mm。

关 键 词:地铁隧道  双圆盾构  地面沉降  控制技术

On Controlling Technique of Ground Settlement during the Double-o-tube(DOT)Shield Excavation
Abstract:It is an effective way of adopting double-o-tube shield construction to resolve underground construction space usage. Taking a running tunnel (Tongji University Station-Dalian Rd. Station-Youdian Xincun Station), the Bid 3 of Shanghai Metro Line 10 for the example, it adopted the plan of DOT shield construction. The causes and the controlling measures to ground settlement were emphasized in this paper. Its accumulated max settling amount was 49 mm through the construction practice.
Keywords:metro tunnel  double-o-tube (DOT) shield  ground settlement  controlling technique