广东地区大直径超长钻孔灌注桩荷载传递特性试验研究
引用本文:赵春风,李俊,邱志雄,赵程,邹豫皖.广东地区大直径超长钻孔灌注桩荷载传递特性试验研究[J].岩石力学与工程学报,2015,34(4):839-845.
作者姓名:赵春风  李俊  邱志雄  赵程  邹豫皖
作者单位:(1. 同济大学岩土及地下工程教育部重点实验室,上海 200092;2. 同济大学地下建筑与工程系,上海 200092;; 3. 广东潮惠高速公路有限公司,广东 广州 510100;4. 深圳中广核工程设计有限公司,广东 深圳 518000)
基金项目:广东省交通运输厅科技计划项目(2012–01–001);国家自然科学基金资助项目(41202193,41272295)
摘    要:通过广东软土地区大直径超长钻孔灌注桩大吨位静载试验,分析该地区大直径超长钻孔灌注桩承载特性及荷载传递机制,为该地区大直径超长桩的理论研究和工程应用提供宝贵的参考数据。实测结果研究表明:试桩的Q-s曲线呈缓变型,桩端承载力分担总荷载比例均低于15%,表现为摩擦桩特性;随桩顶荷载增加,桩土相对位移沿桩身的递增幅度呈先增大后减小的趋势,淤泥质粉质黏土和淤泥达到极限侧摩阻力所需的桩土相对位移分别为17和6 mm,砂土达到极限侧摩阻力所需桩土相对位移为22~27 mm,桩身上部土层侧摩阻力发生不同程度的软化;桩身上部粉质黏土的桩土相对位移为18~23 mm,在桩土总的相对位移达40 mm时,下部粉质黏土层侧摩阻力达到极限值的87%以上,桩土相对位移继续增大时,侧阻增加趋势较为平缓,并逐渐接近于极限值;风化砂岩侧摩阻力随桩土相对位移的增加而增大,极限荷载下侧摩阻力未完全发挥;桩端阻力随着桩端沉降量的增加呈加工硬化型。

关 键 词:大直径超长桩缓变型极限承载力侧摩阻力软化桩土相对位移

EXPERIMENTAL RESEARCH ON BEARING CHARACTERISTIC OF LARGE-DIAMETER AND SUPER-LONG BORED PILE IN GUANGDONG AREA
ZHAO Chunfeng;LI Jun;QIU Zhixiong;ZHAO Cheng;ZOU Yuwan.EXPERIMENTAL RESEARCH ON BEARING CHARACTERISTIC OF LARGE-DIAMETER AND SUPER-LONG BORED PILE IN GUANGDONG AREA[J].Chinese Journal of Rock Mechanics and Engineering,2015,34(4):839-845.
Authors:ZHAO Chunfeng;LI Jun;QIU Zhixiong;ZHAO Cheng;ZOU Yuwan
Affiliation:(1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China;2. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3. Guangdong Chaohui Expressway Co.,Ltd,Guangzhou,Guangdong 510100,China;4. China Nuclear Power Design Co.,Ltd(Shen Zhen),Shenzhen 518000,Guangdong)
Abstract:Based on the large tonnage static load tests of 2 large-diameter and super-long bored piles in Guangdong soft soil area,bearing characteristics and transport mechanism of load are studied in this paper,and the measured results obtained from the tests provide precious data for theoretical research of large-diameter and super-long bored piles in Guangdong area. The results show that load-movement curves of the piles vary gradually. The test piles show the characteristics of friction piles because sharing ratios of pile tip bearing capacity are fewer than 15%. With the increase of pile top load,the increasing rate of relative displacement of piles and soil at certain pile body first increase and then decrease. The ultimate pile-soil relative displacements for completely mobilizing the shaft resistance are found to be about 17mm and 6mm separately in muddy silt clay and silt,22 to 27mm in sand,18mm to 23 in upside silty clay layers of pile. Shaft resistance of upside soil of pile is softened inordinately. The shaft resistance in downside silty clay layers of pile is about more than 87% of ultimate shaft resistance while pile-soil relative displacement is 40mm and increasing rate of the shaft resistance is gently as the relative displacement continues. With the increasing of pile-soil relative displacement,the shaft resistances of weathering sandstone is developing and not fully play finally. Pile side resistance increase as hardening type along with the increasing of pile tip settlement.
Keywords:large-diameter and super-long piles  slowly  ultimate bearing capacity  shaft resistance  softening  pile-soil relative displacement