首页 | 本学科首页   官方微博 | 高级检索  
     


Satisfying the Water Supply Demand of the Channel Tunnel
Authors:G. A. CROSS  BSc CEng  MICE  MBIM   A. G. TURNER  BSc  PEng  MIBM  MSE
Affiliation:Engineering Manager, Folkestone and District Water Company.;Technical Director, Weir Westgarth Limited.
Abstract:
When Europe's largest civil-engineering construction site, the Channel Tunnel, requested a guaranteed source of water during 1988, the Folkestone District Water Company was experiencing the first signs of the drought conditions which were to prevail for the next three years. Whilst infrastructure changes allowed for supplies to be made available to the Channel Tunnel contractors, the increasing reduction of resources meant that an alternative supply of water was required.
The solution to the problem was to utilize desalination by reverse osmosis of sea water taken from the English Channel. The process design and operation of this most arduous of feed water is discussed, demonstrating the successful application of this technology.
Keywords:Channel Tunnel    Duplex stainless steel    energy recovery    hydrocyclone    multi-stage flash distillation    reverse osmosis    thermal compression distillation    water supply
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号