首页 | 本学科首页   官方微博 | 高级检索  
     


Estimeetings: development estimates and a front-end process for alarge project
Authors:Taff   L.M. Borchering   J.W. Hudgins   W.R.   Jr.
Affiliation:AT&T Bell Lab., West Long Branch, NJ;
Abstract:A method for estimating software development effort in the early phases of a large software-intensive project and a front-end process incorporating this method are presented. The application of this methodology to the domestic US 5ESS Switch project (a large multiyear continuing effort, with new features incorporated into yearly releases) is described. For each feature to be estimated, a feature team generates a detailed feature definition with high-level functionality requirements and a high-level design proposal. These are used in a formal working meeting of estimators from affected parts of the project. The meeting produces a development estimate for use in deciding which features to include in the next release. The benefits of this methodology include well-defined milestones (high-level features requirements, high-level designs and estimates), and less tangible benefits like better working relationships between parts of the project, interorganizational synergy and increased confidence in the front-end process
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号