陈四楼煤矿21109综采工作面底板灰岩水治理技术研究
引用本文:史先志,张金陵,姜振泉,付晓龙.陈四楼煤矿21109综采工作面底板灰岩水治理技术研究[J].煤炭技术,2014(9):172-174.
作者姓名:史先志  张金陵  姜振泉  付晓龙
作者单位:中国矿业大学资源与地球科学学院;永贵能源开发有限公司;河南煤化集团永煤公司
摘    要:在水文地质条件相似的情况下,与21109综采工作面临近的21301综采工作面发生了底板灰岩突水事故。通过分析陈四楼煤矿21109综采工作面水文地质条件,实施工作面底板瞬变电磁法勘探探测底板富水异常区,采用底板扰动破坏深度数值模拟及基于BP神经网络的底板扰动破坏深度模型等方法预测了21109综采工作面底板扰动破坏深度,优化设计了底板注浆改造钻孔,杜绝21109综采工作面突水事故的发生,保证了工作面安全生产。

关 键 词:水文地质条件分析  瞬变电磁法  优化设计

Study of Mechanized Mining Face Floor Limestone Water Treatment Technology in Chensilou Coal Mine
SHI Xian-zhi;ZHANG Jin-ling;JIANG Zhen-quan;FU Xiao-long.Study of Mechanized Mining Face Floor Limestone Water Treatment Technology in Chensilou Coal Mine[J].Coal Technology,2014(9):172-174.
Authors:SHI Xian-zhi;ZHANG Jin-ling;JIANG Zhen-quan;FU Xiao-long
Affiliation:SHI Xian-zhi;ZHANG Jin-ling;JIANG Zhen-quan;FU Xiao-long;College of Resources and Earth Sciences,China University of Mining and Technology;Youggui Energy Development Co.,Ltd.;Yongmei Company,Henan Coal Chemical Group;
Abstract:In the case of hydrogeological conditions similar to work with 21109 fully mechanized coal mining face,the limestone floor water inrush in 21301 fully mechanized working face.Chensilou coal mine 21109 fully mechanized working face through the analysis of hydrological and geological conditions,the implementation of the working face floor transient electromagnetic method exploration of water anomaly area of floor,the floor disturbance depth numerical simulation and apical plate based on BP neural network disturbance damage depth model to predict the bottom 21109 fully mechanized working face of disturbance damage depth,optimization design bottom grouting transformation drill,prevent water accidents in 21109 fully mechanized working face of sudden occurrence,guarantees the safety in production of working face.
Keywords:analysis of hydrogeological conditions  transient electromagnetic method  optimization design