三洋港水闸底板水管冷却温控措施优化研究
引用本文:李硕,李同春,孙永明,季昀.三洋港水闸底板水管冷却温控措施优化研究[J].水利水电技术,2015,46(3):65-69.
作者姓名:李硕  李同春  孙永明  季昀
作者单位:(1.河海大学水利水电学院,江苏南京210098;2.水资源高效利用与工程安全国家工程研究中心, 江苏南京210098;3.江苏省太湖水利规划设计研究院有限公司,江苏苏州215128; 4.国家能源局大坝安全监察中心,浙江杭州310014)
摘    要:混凝土初期通水冷却可以起到削峰控温作用,但可能造成水管附近混凝土开裂。本文结合三洋港闸底板通水冷却措施,应用冷却水管有限元直接算法,通过调节通水流量、温度及时间,分析闸底板混凝土温度场和应力场的变化趋势。结果表明:通水流量越大、通水水温越低及通水时间越长均使冷却效果越好。建议可以通过减小冷却水温与混凝土温差,延长通水时间来降低混凝土温度峰值,同时这也可以避免水管附近混凝土产生裂缝。

关 键 词:闸底板  大体积混凝土  冷却水管  通水参数  
收稿时间:2014-11-18

Study on optimization of temperature control measure with pipe cooling for floor slab of Sanyanggang Sluice
LI Shuo,LI Tongchun,SUN Yongming,JI Yun.Study on optimization of temperature control measure with pipe cooling for floor slab of Sanyanggang Sluice[J].Water Resources and Hydropower Engineering,2015,46(3):65-69.
Authors:LI Shuo  LI Tongchun  SUN Yongming  JI Yun
Affiliation:(1.College of Water Conservancy & Hydropower,Hohai University,Nanjing210098,Jiangsu,China;2.National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety,Hohai University,Nanjing210098,Jiangsu,China; 3.Jiangsu Taihu Planning and Design Institute of Water Resources Co.,Ltd.,Suzhou215128,Jiangsu,China; 4.Large Dam Safety Supervision Center,National Energy Administration,Hangzhou310014,Zhejiang, China)
Abstract:The water cooling can play a role of temperature peak clipping for the temperature control during the early-stage of concrete,but it can possibly cause concrete cracking near the cooling water pipe. In accordance with the water cooling measure for the floor slab of Sanyanggang Sluice,the changing tendencies of both the temperature field and the stress field of the floor slab concrete are analyzed through adjusting the cooling water flow rate,temperature and time. The result shows that lager cooling water flow rate,lower cooling water temperature and longer water cooling time can make a better cooling effect. Therefore,it is suggested that the peak value of the concrete temperature can be lowered through reducing the temperature difference between cooling water and concrete,which can simultaneously avoid the creation of concrete cracks near the cooling pipe as well.
Keywords:sluice floor slab  mass concrete  cooling pipe  cooling water parameters  