首页 | 本学科首页   官方微博 | 高级检索  
     

钻孔灌注桩施工的质量控制
引用本文:董秀华. 钻孔灌注桩施工的质量控制[J]. 山西建筑, 2007, 33(5): 108-109
作者姓名:董秀华
作者单位:山西远方路桥有限公司,山西,大同,037006
摘    要:针对钻孔灌注桩施工的隐蔽性,不可预见性,施工工艺复杂,质量较难控制的特点,运用三阶段质量控制原理,详细分析了事前、事中和事后施工质量控制要点,以保证施工质量。

关 键 词:钻孔灌注桩  质量控制  施工工艺
文章编号:1009-6825(2007)05-0108-02
修稿时间:2006-08-22

Construction quality control of cast-in-place bored pile
DONG Xiu-hua. Construction quality control of cast-in-place bored pile[J]. Shanxi Architecture, 2007, 33(5): 108-109
Authors:DONG Xiu-hua
Affiliation:DONG Xiu-hua
Abstract:According to the construction features of cast-inplace bored pile,such as unpredictable,complicate and difficult in quality control three-stage quality control principle is introduced.Corresponding key points are proposed for beforehand,processing and past-action construction quality control in order to ensure engineering quality.
Keywords:cast-in-place bored pile  quality control  construction technology
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号