首页 | 本学科首页   官方微博 | 高级检索  
     

三峡工程施工通航方案设计
引用本文:夏仲平. 三峡工程施工通航方案设计[J]. 中国三峡建设, 1998, 0(4): 4-6
作者姓名:夏仲平
作者单位:湖北省武汉市长江水利委员会设计院施工处!湖北省武汉市,430010
摘    要:
长江是我国重要的水运交通干线,三峡工程施工的通航问题必须妥善解决,针对近几年长江中上游能航一及船舶情况的变化,可采用减驳减载、增设绞滩或大马力推轮换推,提高明渠通能力,加强施工期通的科学管理;三峡水库中蓄水民航应采取客货分流、调度及翻坝转运方案要,并与二期施工期应急通盘考虑。

关 键 词:施工期通航 设计 三峡水利枢纽 航线管理

Construction Navigaiton Planniing
Xia Zhongping. Construction Navigaiton Planniing[J]. China Three Gorges Construction, 1998, 0(4): 4-6
Authors:Xia Zhongping
Affiliation:Xia Zhongping
Abstract:
The Yangtze rivers is an important water transport line in China. The issues con-cerning navigation during the period of construction of the TGP should be carefully dealt with-According to the transport volume and shipping conditions on the Yangtze river in the recentyears, it should be considered that the number of barges and loads is reduced, more towing facil-ities are arranged or ships are pushed by tow boats with larger capacity or pushed in stages, in or-der to improve the navigable capacity; the scientific management of navigation during the con-struction period is strengthened; the passengers and goods are be diverted and transferred overthe dam when navigation interruption during the impounding of reservoir, and the emergencymeasures are incorporated into the planning.
Keywords:Construction navigation Design Study TGP
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号